Amvet Ritz Jv LLC · 140D0426F0695
$14.8KNCI-26-005 Install New BSC
- Agency
- Departmental Offices
- NAICS
- 236220
- State
- MD
- Period
- Jun 17, 2026 – Sep 17, 2026
1,775 MLP-relevant tracked results · data from USASpending.gov · newest record 37 days old — updates delayed
Showing 526–550 of 1,775
Obligated amount as reported by USAspending.
NCI-26-005 Install New BSC
EO 14398 - Leadville, CO National Fish Hatchery Exploratory Water Well June 15, 2026 - September 15, 2026 Fedcology/Parliament DMEAS1ZSTVY8
Replace Generator Pumps_storage Tank
Award of Task Order 47PC5526F0424 Storage and Freight Lobby Renovation 30TH Floor at the Jacob Javits Federal Building at 26 Federal Plaza in New York, NY.
Norcal New Con Red MNT RD Upgrading - Amendment No. 0003 - See Attachments
Project TN Erfo FS CHRKE804 2020-2(4): The Project Consists of Repairing Storm and Flood Damage on Little Gassaway Road (FS 45) and Sina Branch Road (FS 67). Project Work Includes Grading, Roadway Resurfacing, Drain Dip Construction, Replacement O
Consolidated Engineering Building 17
Bid Build GFK ATCT
Minor Construction Task Order
B64 C13 and C17 Motor Repair
Design Build USCG Base Charleston Shore Construction Project
Replace Double Doors and Connected Equipment at the Cesar Chavez Memorial Building
Preserve Charleston Fisher House Project # 534-24-907
Reconfigure USCG Base Kodiak Building 3 to Host a Coast Guard Express Station
0412 Const New Zena Secesh Watershed Restoration Extension
Project 675-26-801, Design-build (DB) Perform Emergency Repairs at Lake Nona Parking Garages
The Purpose of This Project Is to Provide Renovation and Alteration for Chambers 724 at the Warren E. Burger Federal Building & U.S. Courthouse 316 Robert ST. N. ST. Paul, MN 55101
Project No. 583-26-512 - Repair and Investigate Exterior Limestone.
Gaoa Lcic Lighting Upgrade (re-solicitation)
M4 Road Slide Repair
Contract Award for the Contractor to Construct a Gym. See Attached Statement of Work (SOW) Dated May 29, 2026.
Project NP Ser PMS FY25(1) the Project Consists of the Pavement Preservation of Identified Roadways and Parking Areas, AS Well as the Rehabilitation of Dry Creek Bridge. The Work Includes Thin Lift Overlay of Asphalt Concrete Pavement, Stress Absorb
Chickasawhay Road Maintenance FY26
Dos Columbia Plaza Restroom Drain Repairs - Construction Procurement
0403 Gaoa 4DK Upper Green River Corridor Road Improvements PH 2