Serviam Construction LLC · 36C77625C0060
$17.5MEhrm Infrastructure Upgrades at the James E. Van Zandt Veterans Administration Medical Center
- Agency
- Department of Veterans Affairs
- NAICS
- 236220
- State
- PA
- Period
- Oct 14, 2025 – Oct 14, 2027
1,305 MLP-relevant tracked results · data from USASpending.gov · newest record 37 days old — updates delayed
Showing 801–825 of 1,305
Obligated amount as reported by USAspending.
Ehrm Infrastructure Upgrades at the James E. Van Zandt Veterans Administration Medical Center
Dry Sprinkler Replacement in Grand Rapids and Sault Saint Marie, Michigan.
Replacement of the Republic Airport (FRG) Air Traffic Control Tower (ATCT) Heating, Ventilation and Cooling (HVAC) in Farmingdale, NY. See Attached Statement of Work (SOW) for Complete Work Requirements.
47PM0125C0016 - Annual Steam Plant Repair FY25 - Design-bid-build Project to Install/Repair Equipment at the Steam Plant, Provide Optimum Efficiency, and Extend Useful Service Life of Equipment. Location: 325 13TH Street SW, Washington, DC 20407.
656-19-307 Remodel BLDG 51-1 Eastside
Crmo 323904, Rehabilitate Operational Buildings at Idaho Parks
Miin 314972 & Hafo 314578, Rehabilitate Operational Buildings at Idaho Parks
Fallon Federal Building, 31 Hopkins Plaza, Baltimore, MD 21201-2825. Fallon Tigta Renovation.
Annual General Chiller Repairs for 2025
Provide and Install the Access Walkways for the Chiller Cooling Towers at the Central Utility Plant (CUP)
Project No. 593-23-308, Install Fall Protection at VAMC - Las Vegas
Construct New Farm Shop Building---community Based Funded Project
Repair Drain Line
47PF0025F0533 - Roszkowski LED Interior Lighting Replacement at Roszkowski U.S.C.H. Rockford, IL
Project 33156 Building 3 Demolition.
523-23-001 Repair Parking Deck and Structural Systems
Replace the Windows in Accordance with the Design Drawings and Specifications at the Richard Sheppard Arnold Courthouse in Little Rock, AR.
Usdc Courtroom Side Doors Repairs at the Joseph F. Weis JR. US Courthouse in Pittsburgh, PA. PA01588 POP: 7/11/2025 01/08/2026
The Purpose of This Project Is to Repair the Kennel Fencing at the Eagle Pass Kennels Ii Located at 500 South Adams Street, Eagle Pass, Texas 78852.
Steam Tunnel Concrete Repairs Located at 325 13TH ST. NW Washington, DC
CBP Secure Evidence Storage in Appraisers Building, 630 Sansome Street, San Francisco, CA 94111
47PM0125C0015 - Bureau of Prisons Emergency Falling Limestone Protective Measures
506-22-207 Facility Maintenance Upgrades Construction
Material Purchase for Shelter for Bge Rcag Equipment Shelter Purchase in Accordance with All Documentation Provided.
Provide All Tools, Materials, Labor, Quality Assurance, and Supervision for Renovations Resulting in a Fully-functional CLC. Finished Square Footage Is Approx 12,590. The Current HVAC and Components on Roof Will Be Tied to the New Space on 2ND FLR.