Red Lake Construction, LLC · 75H70124C00049
$9.2MFort Thompson Health Center Dental & Optometry Addition
- Agency
- Indian Health Service
- NAICS
- 236220
- State
- SD
- Period
- Sep 19, 2024 – Dec 24, 2026
1,305 MLP-relevant tracked results · data from USASpending.gov · newest record 37 days old — updates delayed
Showing 976–1000 of 1,305
Obligated amount as reported by USAspending.
Fort Thompson Health Center Dental & Optometry Addition
NZP-DC: Improve Perimeter Security SEG8-BUS Lot (PN 2033120).
Expert Services
C115560-CUP Storage for CT Gear Boxes - Vanessa Argote Macia
Many Farms High School Construction Build.
C200224 Cup Boiler Repairs 2024/2025 Co: Zachary Price CS: Linda Liu Cor: Elizabeth Oluwafemi
Cany Needles PV System
Provide All Expertise, Labor, Tools, Materials, Equipment, and Supervision Necessary to Replace Existing Air Handlers (AHU) Throughout the Facility.
Pueblo Pintado Community School - Football Field
Design/Build Cooling Tower to Replace Existing at Dick Cheney Federal Building, 100 East B Street, Casper, WY 82601
Project 528A8-22-816: Consolidate Primary Care Phase 1A Bathrooms
Install Bollards Around the 12TH Street Area to Protect Newly Installed Newton Apple Tree from the Possibility of a Vehicle Running into IT.
MLK Chiller Replacement Cma Services
C200040 Description - Base Award Design-build Renovate Rooms 5A15, 5B16 and 5C20 in Building 49 Co - Dan Burk CS - Dave Seid Cor - Ferdinand Reyes Vendor Poc - Sydney Cody
523-19-602 Install Site Security Campus Wide, VA Medical Center Jamaica Plain, Boston, MA
Constr MGMT for Accessible Experience
Award of Contract No. 47PK1724C0017, "LONG Beach Elevator Modernization Phase 1," Glenn M. Anderson Federal Building, 501 W. Ocean BLVD., Long Beach, CA
Design Phase Erosion Control and Development of Erosion Control and Remediation Plans. The Construction Phase Is to Remediate the Areas of Concerns within the Following Locations 710, 710A and 720, Located Denver Federal Center, Lakewood, Colorado.
Replace Exterior Doors
General Construction SERVICES-G118 Computer ROOM3 15- Ton Crac Units Replacement Located at Fda White Oak Campus, Silver Spring, MD.
Renovation and Expansion of the Mescalero Indian Hospital
Central Utility Plant (CUP) Chiller Replacement
Repair Uph Building Water Damages at CGC Chippewa, Pnum 25818871
Aquatic Center Palo Alto Award
This Project Replaces Existing Boiler in Building 291E with Two Condensing Type Boilers. In Addition, Two Water Heaters Will Be Relocated from Room # 122 to Building 120