Burchick Construction Co Inc · 47PD0224C0003
$28.5MConstruction Services
- Agency
- Public Buildings Service
- NAICS
- 236220
- State
- WV
- Period
- Jan 8, 2024 – May 14, 2027
1,305 MLP-relevant tracked results · data from USASpending.gov · newest record 37 days old — updates delayed
Showing 1101–1125 of 1,305
Obligated amount as reported by USAspending.
Construction Services
Multiple HVAC Projects at Lawton Indian Hospital
Install Gfe Chiller in Building 4755 per FWR R000686467
Demo Wharf at Base Kodiak, AK
The Purpose of This Requirement Is to Provide WHSC Construction Management CM Services Located at the New Executive Office Building 725 17TH ST, NW Suite 2020 Washington, DC 20503
Design-build Construction of the Veterans Affairs Health Care Center, EL Paso, TX
Work: 4TH Floor Judicial Conference Room Expansion & Kitchen Renovation Location: 6500 Cherrywood Lane, Greenbelt, MD 20770 BLDG: MD0232ZZ
Renovate Nutrition and Food Service Kitchen
The Contractor Shall Provide All Tools, Equipment, Materials, Labor, Supervision, Personnel, and Shall Do All Things Necessary That Will Result in the Construction of the Specialty Treatment Expansion (MINOR) Construction Project.
Usss BLDG 411 K-9 Awning Installation
Cuva 224822 Cuva CMR Services - Mod 1
Construction Manager as Agent and Commissioning Services for the Bridge of the America's Land Port of Entry Located in El Paso, TX - TX0951EL
Repair Sanitary Sewer Lines @ U. S. Coast Guard Base Portsmouth, VA.
FWR R000930716 .base Bid: Provide a Split System Dxac, 30 Ton Cru Room A109..ALTERNATE 1: Provide a Split System Dxac, 30 Ton Cru Room C210..ALTERNATE 2: Provide Two Split System Dxac 25 Nominal Ton, Cru Units for Rooms B204 and B208
Replace Emergency Generators at WPB VAMC
Indianapolis VAMC Ehrm Infrastructure Upgrades Construction
North Complex (11) - Con - Relocation of FR Fire Crews Design Build
This Is a Design Build Effort to Add an Addition to the Existing Shipping and Receiving Building at Fbi Redstone's North Campus.
Deli Hood Fire Suppression
Recapitalization of Station Building and Ant Storage Area at USCG Sector Buffalo, Buffalo Ny
The Purpose of This Contract Is to Award Construction Services for the Denver Federal Center, Lakewood, Colorado
Construction Contract to Update Ehrm Data in Data Center at Kansas City Mo VAMC
This Is a New Project That Consists of the Removal of Existing Building 62 Switchgear 62A and 62B with Installation of a New Replacement Switchgears and the Installation of Atss for Preventive Maintenance.
Border Infrastructure Construction
Gering Area Control Building Repairs