Lake Contracting, Inc. · 140FC225F0020
$8.4KAquatic Herbicide Application 21 Ac
- Agency
- U.S. Fish and Wildlife Service
- NAICS
- 237310
- State
- IL
- Period
- Sep 10, 2025 – Jul 1, 2026
180 MLP-relevant tracked results · data from USASpending.gov · newest record 36 days old — updates delayed
Showing 126–150 of 180
Obligated amount as reported by USAspending.
Aquatic Herbicide Application 21 Ac
Disaster, Bush Loop Accessible Paved Trail Reconstruction
127EAW25C0028 - Lassen Creek Passage Restoration
NP Rocr 910(1) the Project Consists of the Replacement of the Edgewater Stable Access Bridge Deck, Bridge Rail and Curbs, and the Reconstruction of Bridge Approaches. The Work Also Includes the Repair of Existing Bioretention Facilities, and Other
Blm-co Gjfo 18RD Event Area Grading Idr 140L1723D0001
Bridgeport Compound Asphalt
Cheoah and Tusquitee Road Rehabilitation Project
CMRD and CFRLN Funds for FY25 Road Maintenance Contract on the De Soto National Forest
Disaster Supplement; Daly Creek Bridge Replacement and Road Repair
Midewin Boathouse Road Culvert Replacement
Moratorium Class Exception - Road Treatments for Emergency Road Stabilization Throughout the Angeles National Forest.
NC Erfo NP Blri 2024-1(9) the Project Consists of Roadway Excavation, Embankment Construction, Culvert Replacement, Pavement Patching, Reestablishing Slope, Backfilling with Fallen Soil, Turf Establishment and Topsoil, Stone Masonry Work, and Othe
Qza Parking Lot Replacement
Construction - Box Culvert Installation
Qna Parking Lot Replacement
Provide for and Furnish All Labor, Materials, Equipment, Qualified Supervision, and Other Items Designated in This Solicitation in Accordance with the Specifications and Drawings to Complete Project 556-23-105 Roadway and Sidewalk Improvements.
FSR Reconditioning and Reconstruction of Bolan Lake Campground (WILD River Res Ranger District). (WESTERN Oregon Road Construction IDIQ 2024)
MS NP Guis 15(4) This Project Consists of the Construction of Paved Shoulders, Boardwalks, Culvert Replacement, and Guardrail Replacement. The Work Includes the Installation of a Bottomless Box Culvert, Grading, Paving Shoulders, Microsurfacing And
Task Order (TO) - Erfo East Rosebud Road Permanent Repairs on the Custer Gallatin National Forest, per Attached Terms, Specifications, Item Schedule, FSSS'S, Plans,wage Determinations and Maps
Project Va NP Blri 1G27 the Project Consists of for the Rehabilitation of James River Bridge (structure 5140-016P). The Work Encompasses Cleaning and Sealing Minor Cracks, Removing Vegetation on Piers, Cleaning and Patching Spalls, Large Cracks, And
NM BR Aao ELBU(1). The Project Will Use Asphalt and Aggregate Base to Resurface, Restore, and Rehabilitate Multiple Road Segments within the Elephant Butte Historic District. Six Paved Parking Lots Will Be Rehabilitated and Repaved.
NM NP Multi PMS(1), Pavement Preservation New Mexico
NP Natr 3N18, 3H27, Etc - Geotechnical, Pavement Rehabilitation, and Structural Repairs Between MP 121 and MP 204 (PHASE 2), Project MS NP Natr 3N18 3H27 Etc, Solicitation Number 693C73-25-B-000003, Located in Attala, Choctaw, Leake, Madison, and Web
TX NP Bibe 13(6) West Entrance Road Repair
Project Pa Erfo FW CHV 2020-1(1): The Project Consists of the Rehabilitation of Back Nine Trail, Ridge Nature Trail and Ridge Nature Parking Area. The Work Includes Removing and Replacing Asphalt Concrete Pavement, Roadway Excavation, Roadbed Recond