Raul Cruz · 36C26125P1119
$352.8KEmergency Repair of 15KV Transformer at VAMC - SF
- Agency
- Department of Veterans Affairs
- NAICS
- 238210
- State
- CA
- Period
- Jun 6, 2025 – Jun 9, 2027
227 MLP-relevant tracked results · data from USASpending.gov · newest record 36 days old — updates delayed
Showing 126–150 of 227
Obligated amount as reported by USAspending.
Emergency Repair of 15KV Transformer at VAMC - SF
Replace Uninterpretable Power Supply (UPS) Batteries Located at WTC, Floor 53. The UPS Battery Cabinets Currently Supporting Essential IT Infrastructure in the Building Have Not Undergone Battery Replacement Since 2017/2018-TIME Frame. The Batteries
This Is a New Task Order Under Kiktechnologies ("KIK") IDIQ 693JJ322D000009.THIS Order Will Procure Labor and Materials to Installing the Cable Installing Cable Infrastructure for the Upgrade of the Current Wan/Lan/Wlan Environment at Dot,
UPS Requirement for Portland Vba Regional Office
Efo and Ira Infrastructure Modernization Project
Electrical Blanket Purchase Agreement Call to Restore Kars Park Damaged Power in the South Area at Kennedy Space Center, Florida.
Construction Project No. 610A4-20-107 - Replace Fire Alarm System.
This Is a New Task Order Under Kik Technologies ("KIK") IDIQ 693JJ322D000009. This Order Will Procure Labor and Materials Required to Installing the Cable Infrastructure for the Upgrade of the Current Wan/Lan/Wlan Environment within the U.S
Arpo - Replace DP-2 Panel and Restore Power
437-25-103, 3 Year Electrical Testing & Maintenance
The Purpose of This Task Order Is to Procure and Install the Cable Infrastructure for the Ost HQ Spine Leaf Architectural Upgrade Phase 2 at Dot Headquarters Under Kik Technologies 693JJ322D000009.
Electrical Distribution Maintenance Testing Base Plus Four
Split System Cooling Replacement at MKC Artcc (OLATHE, KS)
(IIJA) Funded Eg Design Project, Site Specific: Seattle Wa (CJL) Alsf, JCN: 21002784, per Eld Pmo. (EG Design Project Part of Eld Sea Project.)
Iija Funds. Site Specific Installation Cost for Eg and FST Replacement, Erms Installation and Full Power System Study at Oilton, TX (QZA) Arsr JCN:23007873
Fastc Underground Cabling Plant Maintenance, Location Service, and Building Cable Additions
N063- Installation of Alarm with Construction Services for Replacement of a Networked Fire Alarm and Voice Evacuation System
F11 CPDS Funding Is Allocated for a Temporary Logistics Site Dedicated to Staging, Inspecting, and Repairing CPDS Project Equipment Exclusively. JCN: N/A
The Purpose of This Task Order Under Kik IDIQ 693JJ322D00009 Is a Follow on Task Order for the Coe Baseline and Stennis Task Order. This Award Provides Incremental Funding Through 10/31/2025. Need By: 7/1/2025 This Amendment Corrects the Line O
Replace Fused and Obsolete Electrical Panels
Fletc Cheltenham Automated Logic Webctrl Point to Point Assessment and Maintenance Program. Section 2. (d) Exemption
(IIJA) Funded System Re-cable Project Install, Long Lead Items Site Specific: Windsor Locks, CT, (MYQ) Malsr, JCN: 18064962, per Eld Program Management Office. Justification: Aircrafts Inability to Land During Inclement Weather If This System Is I
The Purpose of This Contract Is to Install Fiber Optic Cables, Lan Cables, Security Cameras, and Cards in Support of the Krome Service Processing Center Network Backbone Project.
Stryker Gurney Maintenance
Maintenance, Supplies, and Services Support for Physical Access Control System, Intrusion Detection System, and CCTV