Rbvetco, LLC · 36C78626P0055
$34.7KEmergency HVAC Replacement
- Agency
- Department of Veterans Affairs
- NAICS
- 238220
- State
- MA
- Period
- Jul 6, 2026 – Jul 31, 2026
195 MLP-relevant tracked results · data from USASpending.gov · newest record 36 days old — updates delayed
Showing 26–50 of 195
Obligated amount as reported by USAspending.
Emergency HVAC Replacement
Engineered Heat Load Calculations to Determine Correct Unit Size and Planning for Installation. Building 91 Second Deck HVAC - Ceuc Approved
As Approved in Ratification Memo RAT-26-003, WE Are Requesting to Pay the Invoice for Emergency Repairs and Parts That Were Necessary to Restore the Manchester Research Station's Chiller to Normal Operating Status in Accordance with the Attached
Replacement of Three Condenser Compressors (HVAC) in Carlsbad Caverns National Park
Replace Boiler Loch Raven Building 5
FY25 Annual Boiler Inspection
26Z5AY9N -emergency Chiller Repair Fy 26 Chiller 1. EO 14398
Navasota, TX - TNV Vor HVAC Replacement in Accordance with the Attached Specifications and Drawings.
York Chiller Spare Parts
MLB Arsr HVAC Replacement/Electrical Refurbishment
Repair Painted Desert PD212 HVAC Unit
Repair Leaking Boiler Tubes in Boiler Number One, Building 91, USCG Base Elizabeth City, NC.
Emergency HVAC Replacement - Buff
Task Order Against the O&m Services Contract at the Addabbo Building to Repair the Return Oil Sump Leak Found on Chiller #2.
HVAC Replacement
EO 14398 HVAC Maintenance
Emergency HVAC Condensing Unit Repair for the Wakefield, VA Weather Forecast Office
Boiler Economizer Inspection for the Oklahoma City Va Medical Center
Per Attached Quote & SOW: Trane Chiller Leak Repair on Chiller# 4 Model CVHF077 Serial L01B07173 EO 14398
Award for the Chiller Plant Isolation Valve Install at the Rice Federal Building and Courthouse in Dayton, OH
Bsee-goar HVAC Preventative Maintenance
Umesc Hydronic Boiler Replacement
Station Bellingham HVAC Replacement for Server Room
Greenbrier Ranger Station HVAC Replacement: The Project Will Include the Installation of 1 New 15 KW Air Handler, and a 4-TON Heat Pump with a New Thermostat, Wiring, Connection to Existing Ductwork, Electrical Disconnects, Set on Existing Pad for T
Ut - Bear River Migratory Bird Refuge - Preventive Maintenance - Hvac-systems (BASE + Four Option Years)