Dri, Inc. · 140P5126P0062
$21.7KCyclic Painting of 3 Picnic Pavilions, Selma to Montgomery National Historic Trail, Semo
- Agency
- National Park Service
- NAICS
- 238320
- State
- AL
- Period
- Jul 28, 2026 – Oct 30, 2026
11 MLP-relevant tracked results · data from USASpending.gov · newest record 36 days old — updates delayed
Showing 1–11 of 11
Obligated amount as reported by USAspending.
Cyclic Painting of 3 Picnic Pavilions, Selma to Montgomery National Historic Trail, Semo
Repainting of Vaq 03, 82 and Waq 4065, 4208, & 4209 - Yosemite NP - Mariposa County, CA
Painting Interior Walls in Constructions Zone.
Project to Refurbish and Paint the Secondary Canopy at Sasabe Lpoe, Sasabe Az
Paint Exterior and Interior Surfaces at Station and Ant Humboldt Bay
Re-coating of the Concrete Water Storage Tanks at U.S. Embassy Kigali, Rwanda.
Repaint Interior Spaces at US Coast Guard Air Station Astoria
Z2AA-PATCHING and Painting Services for the 2ND Floor Hallways of the William Jefferson Clinton East Building (washington, DC)
Z2AA-PATCHING and Painting Services for the 1ST Floor and Basement Floor Hallways of the William Jefferson Clinton East Building (washington, DC)
Construction Project 508-26-102, Building 1 Exterior Repair and Coating Phase 1 FY26. Rfo 52.222-90 Clause for EO 14398 Included.
Relocate the Existing 20 Foot Vehicle Security Gate Further Down the Access Road to Operate as the Egress and Add Additional Fencing. Relocate All Components Associated with the Gate Inclusive, but Not Limited To, the Access Controls, and Telephone.