Schindler Elevator Corporation · 36C24526N0533
$117.4KElevator Maintenance and Inspection Services
- Agency
- Department of Veterans Affairs
- NAICS
- 238290
- State
- WV
- Period
- Aug 1, 2026 – Jul 31, 2027
5,140 MLP-relevant tracked results · data from USASpending.gov · newest record 36 days old — updates delayed
Showing 501–525 of 5,140
Obligated amount as reported by USAspending.
Elevator Maintenance and Inspection Services
Emergency 43M50 43M57 Con-edison Feeders Margaret Cochran Corbin Va Campus
Tunison Gravel Parking Lot Project
Contractor to Provide All Labor, Materials and Support Necessary to Restore and Repaint Drywall in Accordance with the Statement of Work at the Calexico Border Station, 1699 E. Carr RD., Calexico, CA 92231.
Orpi 240821 Construction Management Serv
In Accordance with the Attached Statement of Work, This Award Is to Replace the Attic Insulation and Ceilings at the Jordan River National Fish Hatchery. The Project Shall Also Include Work Such as the Replacement of the Blown-in Insulation, Acousti
Grounds Maintenance Services
Repair and Restoration of Water-damaged Areas in the Basement, First Floor and Second Floor at Alliance Tower Federal Building 8701 South Gessner, Huston, TX. TX0297ZZ.
Visn 8 IDIQ Joc General Construction
Navasota, TX - TNV Vor HVAC Replacement in Accordance with the Attached Specifications and Drawings.
Erss Year 6 Clin 0006 Groundwater Treatment Plant O&m Surge
The Purpose of This Task Order Is to Provide Funding for Emergency Services to Be Performed by Islas GC.
Construct Two New Aquatic Organism Passageways Aops in the Plant Creek Drainage on the Missoula District of the Lolo National Forest. One on NFSR 464 at MP 0.272, and One on NFSR 19022 at MP 0.000. The New Structures Will Replace Stormed Damaged Unsu
Eeob Ens Legacy Project
The Purpose of This Task Order Is to Replace the Data Center Cooling Located at 219 South Dearborn Street Chicago, Illinois 60604 IL0205ZZ.
Emergency Water Heater Replacement
EO 14398 - 2026 Blri Cyclic Vista Maintenance
SD FTFW Madi 10(2) & 9000(1) Rehab Madison WMD HQ Road - Construction Contract
NCFB Upper Parking Deck Coating System Replacement- NH0037ZZ. This Task Order Contract Is for the Contractor to Provide Labor, Equipment, and Material to Complete the Upper Parking Deck Coating Replacement.
EO 14398- Replace Roofing on Houses
PSS - RFK Justice Command Center Construction Phase I
Custodial Services to Clean All of the Facilities on the Pocatello Campus of Approximately 315,000 Square Feet.
Iowa City Federal Building - RIA34631 Chiller 2 Replacement Located at Iowa City Federal Building 400 S. Clinton ST, Iowa City, IA 52240
Replace the HVAC System That Serves the Rooms/Offices in the Cardiac Catheterization Lab.
589A5-23-199, Ajp Fca - Replace Existing Roofing, Window, Security Cameras