Grace & Naeem Uddin Inc · 47PE5526F0497
$118.9KRepair 5TH Floor Flood Event, Miramar FL
- Agency
- Public Buildings Service
- NAICS
- 236220
- State
- FL
- Period
- Jul 15, 2026 – Jan 30, 2027
5,140 MLP-relevant tracked results · data from USASpending.gov · newest record 36 days old — updates delayed
Showing 576–600 of 5,140
Obligated amount as reported by USAspending.
Repair 5TH Floor Flood Event, Miramar FL
Task Order Against Siearra/Mohave Construction Matoc 2026
Replace Storm Pipe and Asphalt Roadway
Construction Surveillance Technician Services
Repainting of Vaq 03, 82 and Waq 4065, 4208, & 4209 - Yosemite NP - Mariposa County, CA
EO 14398 NM Dexter NFHTC Pond Liner 12B & 13B
Ralston Remedial Action and GWM per Statement of Work.
Coweeta Wet Laboratory Renovation - Gaoa Location: Nantahala National Forest- Otto, NC
MLB Arsr HVAC Replacement/Electrical Refurbishment
Design-build Construction Services for the Generator Installation at the Young Federal Building Saint Louis, MO
Multiple Award Task Order Contracts for Construction Services Located in MD, DC and WV EO 14398
Call Order Against 693JK422A500003 for Cafeteria Demo for Consolidation Future Project Space in the Amount of $1,659,851.24 and the POP from 6/23/2026 to 5/15/2027.
MF 26-2 Willamette Complex Suppression Repair South. Road Maintenance in Response to Suppression Activities from the 2024 Willamette Complex.
Jet a Fuel Storage Tank Systems
Project 548-23-105 NRM BB Upgrade Interior Signage and Wayfinding
Fire Alarm Replacement, Paul Findley Federal Building, Springfield, IL the Primary Objective for the Fire Alarm Replacement Is to Replace the Existing Fire Alarm System and Its Components Due to the Age of the Fire Alarm System.
Elevator Modernization Fairbanks FB & CH
Replace Existing Fiber Loop 1 (FOTS) at MSP Airport in Minneapolis, MN
Project TN Erfo FS CHRKE804 2021-1(2): The Project Consists of Design Services, Slope Stabilization, Roadway Reconstruction, Asphalt Concrete Pavement, and Other Miscellaneous Work.
Elevator Modernization C Clifton Young Usch
Project TN Erfo FS CHRKE804 2020-2(1): This Project Consists of Repairing Various Damaged Sites on Paint Mountain Road (FS 54), Briar Creek Road (FS 188), and Flatwoods Road (FS 87). Project Work Includes Grading, Roadway Resurfacing, Drain Dip Cons
619A4-23-104 | Replace Generators Building 5 & 90
Tuma Install Fire Protection Systems
This Contract Provides Detention and Detention Related Services at the Big Horn Detention Facility in Hudson, Colorado. This Task Order Provides Establishes the Base Period Clins and Provides Funding for the Transition Period.
The Scope of Work Includes the Design, Procurement, and Installation of New Underground Duct Bank Infrastructure and Associated Electrical Distribution Systems at Kennedy Space Center, Florida. The Project Encompasses Approximately 26,000 Linear