Central Heating & Cooling Inc · 140P6426P0047
$21.1KEmergency HVAC Replacement - Buff
- Agency
- National Park Service
- NAICS
- 238220
- State
- AR
- Period
- Jul 15, 2026 – Sep 14, 2026
294 MLP-relevant tracked results · data from USASpending.gov · newest record 36 days old — updates delayed
Showing 51–75 of 294
Obligated amount as reported by USAspending.
Emergency HVAC Replacement - Buff
Task Order Against the O&m Services Contract at the Addabbo Building to Repair the Return Oil Sump Leak Found on Chiller #2.
Replace Main Building Chiller Unit
Nmah: Repair / Replace HVAC Components.
HVAC Replacement
Belcourt Heat Exchange and Boiler Replacement
EO 14398 HVAC Maintenance
Emergency HVAC Condensing Unit Repair for the Wakefield, VA Weather Forecast Office
Replace HVAC Equipment IT Server Room United States District Court 601 West Broadway Louisville, KY 40202
Boiler Economizer Inspection for the Oklahoma City Va Medical Center
Per Attached Quote & SOW: Trane Chiller Leak Repair on Chiller# 4 Model CVHF077 Serial L01B07173 EO 14398
Award for the Chiller Plant Isolation Valve Install at the Rice Federal Building and Courthouse in Dayton, OH
Bsee-goar HVAC Preventative Maintenance
Umesc Hydronic Boiler Replacement
Boiler Plant Replacement Project on the 14TH Floor of the Fritz Lanham Federal Building at 819 Taylor Street in Fort Worth
Station Bellingham HVAC Replacement for Server Room
Greenbrier Ranger Station HVAC Replacement: The Project Will Include the Installation of 1 New 15 KW Air Handler, and a 4-TON Heat Pump with a New Thermostat, Wiring, Connection to Existing Ductwork, Electrical Disconnects, Set on Existing Pad for T
Ut - Bear River Migratory Bird Refuge - Preventive Maintenance - Hvac-systems (BASE + Four Option Years)
C202286 - Construction Cup Chiller #27 Compressor Repair BLDG 11, Wayne Smalls
The Purpose of This Task Order Is to Provide Ae Design Services for the Replacement of the HVAC System for Cold Storage at the LBJ Presidential Library and Museum in Austin, TX.
657-21-115JC - Correct Heating, Ventilation, and Air Conditioning Systems in Procedure Rooms
This Project Will Replace the Outdated HVAC System with a Modern, Energy Efficient Unit That Meets Current Federal Environmental and Performance Requirements. Utilizing the Existing Ductwork Minimizes Project Cost and Disruption While Ensuring Compat
26Z3AV6 - Ecs - Chiller Compressor Repairs Q-06-2026-478925
Base Bid: Demolish Existing Safety Switch, Install New Enclosed Circuit Breaker and New Safety Switch with J-type Fuses to Reduce the Available Fault Current at Chiller to Be Less Than the Fault Current Rating of the Chiller.
Clever Brooks Boiler Safety Services