Asrc Federal Advanced Research, LLC · 6973GH26F01048
$207.2KF11 Erms Optimization for Various Sites Vendor: Asrc Federal Advanced Research, Inc
- Agency
- Federal Aviation Administration
- NAICS
- 238210
- State
- GA
- Period
- Jul 8, 2026 – May 31, 2027
5,138 MLP-relevant tracked results · data from USASpending.gov · newest record 37 days old — updates delayed
Showing 851–875 of 5,138
Obligated amount as reported by USAspending.
F11 Erms Optimization for Various Sites Vendor: Asrc Federal Advanced Research, Inc
Funding to Support Joc FFS'S Small Construction and Repair
Funding to Support Joc FFS'S Small Construction and Repair
Building 126 Dermatology Clinic Ceiling and Infrastructure Refresh
Renovation of the CS1 and CS2 Secure Office Areas Located at the Emmett J. Bean Federal Center, 8899 East 56TH Street, Indianapolis, IN.
BRVB - Entry Courtyard Improvements
Seki Repair Fire Damaged Wuksachi Bridge the Contractor Shall Provide All Mobilization, Labor, Supervision, Materials, Equipment, Transportation, Site Rehabilitation, Clean-up, and Demobilization. The Scope of This Proposed Contract Is to Repair The
Replace Vor with Dme Shelter & Antenna at the Natchez, MS (HEZ) Dme in Accordance with the Specs and Drawings.
Replace Medvac Skid with Wagd Certified 589A4-26-061
Prepare Site for Ir Replacement 589A426-052
Replace 3RD Floor East Roof 589A4-26-062
589A6-24-407, Upgrade Building 71 Restrooms for ADA Compliance
657-22-112JC Phase 1 Prepare Site for Cath Labs
Incineration of Controlled Substances Collected from Dea Mcallen District Office.
Antenna Tower Replacement at the HLN RTR Site in Helena, MT in Accordance with the SOW and Drawings.
Larch Mountain, WA - Tower Replacement Larch Mountain (QLD) (RCLR) in Larch Mountain, WA in Accordance with the SOW and Drawings.
Non-core Telecommunications Support for Coe/WCF/Baseline
Eisenhower and Snell Lock North Side Paving Improvements
Cor: John Hillenbrand Alternate Tocor: Eric Canteenwala Primary Po (PRIMARY Invoice Approver): Luke Groenveld Alternate Po: Lisa Ouyang
757-21-101 Replace Roof Building 1A EO 14398
Upgrade Energy Management System Tennessee Valley Healthcare System, Alvin C. York Campus, Murfreesboro,tn.
657-21-115JC - Correct Heating, Ventilation, and Air Conditioning Systems in Procedure Rooms
Contractor to Provide Tools, Equipment, Materials, Labor, Supervision, Personnel, & Shall Do All Things Necessary That Will Result in Completion of Ehrm Infrastructure Upgrades Construction Project, Accordance with Specifications & Drawings. EO14398.
Power Pole and Transformer Replacement
Garbage Service 1301 So G Street