M2 Engineering, LLC · 70B01C25P00000643
$104.3KPurchase Order (PO) Award for the Contractor to Design Women's and Men's Locker Rooms at Massena, NY.
- Agency
- U.S. Customs and Border Protection
- NAICS
- 236210
- State
- NY
- Period
- Sep 26, 2025 – Oct 31, 2026
175 MLP-relevant tracked results · data from USASpending.gov · newest record 36 days old — updates delayed
Showing 76–100 of 175
Obligated amount as reported by USAspending.
Purchase Order (PO) Award for the Contractor to Design Women's and Men's Locker Rooms at Massena, NY.
Construction to Renovate K9 Kennel at Champlain Lpoe
Cit Red Glass Replacement. Court of International Trade (US Cit). New York, NY 10278
Binghamton First Floor Site Security Manager Services
47PC0225F0044 - Alfonse D Amato Federal Courthouse Parking Garage Repair Design Build, Central Islip, NY
Replace 5MV Transformer
632-15-101 Replace Primary Electrical Distribution, PH 1
The Award for the Keating Chambers 2530 Renovation- Construction Project as Described in the SOW Dated 4/9/25 Is to Blasco Construction Corp for a Total of $1,215,948.47. The Contractor Will Have 270 Days to Complete the Project Once NTP Is Issued
Kitchen Equipment Site Prep
New York Regional Office (NYRO) Operational/Facility Support Services
Replace Uninterpretable Power Supply (UPS) Batteries Located at WTC, Floor 53. The UPS Battery Cabinets Currently Supporting Essential IT Infrastructure in the Building Have Not Undergone Battery Replacement Since 2017/2018-TIME Frame. The Batteries
Project 528A8-22-860 Pneumatic Tube Completion at the Albany VAMC
Circuit Court Library Renovation
Construction Services for New Land Port of Entry at Rouses Point, NY.
Elevator Maintenance, Repair, and Inspection Services.
Replacement of the Republic Airport (FRG) Air Traffic Control Tower (ATCT) Heating, Ventilation and Cooling (HVAC) in Farmingdale, NY. See Attached Statement of Work (SOW) for Complete Work Requirements.
Bronx Regulated Waste Base Plus 4 Option Years
Waste Removal Services for MDC Brookyn, Building 4, and Dayton Manor (june-sept FY25)
Department of Energy (DOE) Environmental Management (EM) West Valley Demonstration Project (WVDP) Task Order 2
Regulated Medical Waste Removal and Disposal
Repair PV Solar System 632-24-130
The Construction Task Order Award to SJ Thomas for the Aerial Walkway Bridge Repairs and Replacement- Construction Project Located in Albany, NY Is for a Total of $2,615,800.00 with the Period of Performance of 5/27/25 to 3/3/26.
New York Tracon (N90) Facility Phase 1 (SITE Survey/Design) Security System (WORK Plan 2022-EA-002)
Rochester, NY ATCT/Tracon (ROC) Janitorial Services
Replace Fused and Obsolete Electrical Panels