Todd Bonney Trucking, LLC · 140FS326F0103
$272.4KHazardous Fuel Reduction Treatment, Lost Trail NWR, MT National Fuels Reduction BPA
- Agency
- U.S. Fish and Wildlife Service
- NAICS
- 238910
- State
- MT
- Period
- May 13, 2026 – Dec 31, 2027
5,138 MLP-relevant tracked results · data from USASpending.gov · newest record 38 days old — updates delayed
Showing 1476–1500 of 5,138
Obligated amount as reported by USAspending.
Hazardous Fuel Reduction Treatment, Lost Trail NWR, MT National Fuels Reduction BPA
UCGPM26018 - Provide Labor, Materials and Equipment to Mitigate the Harmful Affect of Oil Spill or Hazardous Chemical Incident, AS Directed by the Federal on Scene Coordinator Representative.
Nv-desert Nwr-irrigation Installation
Fire Sprinkler, Extinguisher Annual Insp
Replacement and Repair of 3 Dam Primary Spillway Valves on the Hoosier National Forest
C201815 Design and Construction Services to Modify the Lab Supply Air Ductwork to Get Sufficient Air into Lab B1A20 to Satisfy Existing Hood Exhaust Requirements
The Purpose of This Project Is to Do Hotwell Structural Inspection and Minimum Repair Work for the Central Heating and Refrigerator Plant the POP Is 365
CT Mechanical Satoc - HVAC and Plumbing - Loading Dock HVAC, Project 689-26-104
The Contractor Shall Provide All Labor, Materials, Equipment, and Supervision Necessary to Install Water Service Lines, Sewer Piping, Septic System Components, and Associated Connections, Including Mobilization and Demobilization, IN Accordance Wi
To Obligate Funding to Exercise Option Year 4 (1 May 2026 - 30 April 2027)
Incorporates TK'S Proposal Dated 4/21/26, for the Elevator Modernization at the Greenbelt Maryland Usch Located on 6500 Cherrywood Lane.
Dso Guard FY26 - D30 - Galetich, Todd Primary Cor: Joy Esser A-cor's-michael Mosely, Nick Amadeo, Shane Bellis, and Edward Williams
The Contractor Shall Be Responsible for Providing All Labor and Equipment Required for the Repair Roof, Roof Drain, Roof Rafter Tail, Flashing and Roof Drain Line for BLDG. 91, 92 & 93. FPDS-NG System Issues Forcing Emergency, When Far 13 Urgent.
Mission-critical: Transporting and Producing Prisoners for Court Proceedings. FY26 Dso Base Year
Sgfo Recreation Site Janitorial Service
Annual Fire Alarm Testing & Inspection for Anadarko Agency
Dothq Kik Replacement of Vulnerable Ip Cameras & Mailroom Hallway Monitoring
To 9023 Santa Fe Springs RD Lab. Initial Funding Award.
Septic Tank Drain Repair
Year Round Janitorial Services Weekly Cleaning for the Slate Creek Ranger Station Main Office, Fire Office, Fire Office Annex, Warehouse Bathroom, and 1/2 Year Weekly Cleaning for the Fire Annex Shower Room. Biannual Services for the Slate Creek Bunk
B64 Lube Oil Pump
523A4-CSI-401 Cath Lab Site Prep Design-build at the VAMC West Roxbury, MA
Gaoa - Nulhegan Basin Reroof Admin Building at Silvio O. Conte NFWR
Tash J Group Inc. Is to Complete Landscaping Improvements at the Hammond U.S. Courthouse at 5400 Federal Plaza Hammond in Indiana 46320 According to the Scope of Work Dated 4/16/2026.
Gaoa Herman Creek Trailhead Renovation