Lego Construction Co · 70Z08226FCEUM0012
$412.8KReplace HVAC Station Building at U.S. Coast Guard Station Destin, FL.
- Agency
- U.S. Coast Guard
- NAICS
- 236220
- State
- FL
- Period
- Feb 10, 2026 – Sep 30, 2026
294 MLP-relevant tracked results · data from USASpending.gov · newest record 36 days old — updates delayed
Showing 151–175 of 294
Obligated amount as reported by USAspending.
Replace HVAC Station Building at U.S. Coast Guard Station Destin, FL.
Preventive Maintenance Services for Sandpoint Ranger District Office HVAC System
Fci Marianna - Install HVAC System Food Service - 25Z3AC5
Contract Award for the Chiller Replacement Project in Charleston, SC
Award of Contract No. 47PD5426C0001 - Fbi Chiller Replacement
The Contractor to Provide Labor, Project Management, Materials, Tools, Supplies, and Equipment to Provide Infrastructure Improvements (electrical, Bonding, UPS, Renovate Data Center, Communication, Fiber Backbone, HVAC, Reconfiguration, Etc.)
Flatwoods Gym HVAC Rehab. Replace Two Non-operating Package HVAC Systems Along with Duct Work and Gas Pipe That Provides Heat and Cooling to the Gymnasium.
598-21-108 Upgrade Heating Water System-lr 270 Calendar Day Period of Performance After Issuance of NTP.
Upgrades to the Central Utility Plant (CUP) Boiler Controls System, Manhattan, KS (MEP To)
Contractor Is to Repair/Replace/Upgrade the Boiler Plant Ventilation System in Building 11
Boiler Safety Device Testing - Nwi
Interagency Natural Resource Center-hvac Preventative Maintenance
Pa John Heinz NWR HVAC Maintenance Service Agreement
Courtroom Chiller Replacement, Phillip Burton Federal Building, 450 Golden Gate Ave, San Francisco, CA 94102
Hi Maui NWR Complex HVAC Maintenance
Ventilation Repairs
Building 301 - Redundant HVAC Condenser for Mezzanine Computer Server Room
C112535- Construction for BLDG. 8 & 8A Reheat and Terminal Unit Replacement- Phase 01. The Project Is to Replace the Reheat Components, from the Heat Exchangers to the Terminal Unit Reheat Coils Will Improve Occupants' Comfort.
This Is a Construction Purchase Order for Replacing the Heat Trace on the Containment Valve at the Fuel Farm on Base Kodiak.
Replace HVAC at SBN ATCT, South Bend International Airport, South Bend, IN
HVAC Replacement Phases 2A.
Boiler and Stack Testing
Provide Preventive Maintenance and Service for Geothermal Well System and Heating, Ventilation, and Air Conditioning (HVAC) Systems for the National Weather Service (NWS) Weather Forecast Office (WFO) Offices in Caribou, ME and Hodgdon, ME.
Cabinet Air Conditioning Interval Preventative Maintenance
PN: 656-18-301 Upgrade Building 51 HVAC for the ST. Cloud Vahcs