Advanced Turf Services, L.L.C · 36C78626N50842
$49.7KGrounds Maintenance Bridge for Rock Island National Cemetery
- Agency
- Department of Veterans Affairs
- NAICS
- 561730
- State
- IL
- Period
- Jul 28, 2026 – Sep 30, 2026
140 MLP-relevant tracked results · data from USASpending.gov · newest record 36 days old — updates delayed
Showing 1–25 of 140
Obligated amount as reported by USAspending.
Grounds Maintenance Bridge for Rock Island National Cemetery
Ehrm Installation DDP02- Hines Il
BLDG 6
Lift Station and Grease Trap Maintenance Services
MCC Chicago Roof Replacement
The Purpose of This Procurement Is to Obtain Comprehensive Year-round Grounds Maintenance Services for Landscaping, Lawncare and Snow Removal at the Fema Aurora Annex Building, Located at 635 W. Indian Trail Road, Aurora, Illinois 60506.
Urgent Turf Application Services at the Camp Butler National Cemetery.
Suite 124 Flooring Replacement, Paul Findley Federal Building, Springfield, IL. Removal and Replacement of Flooring in Room 124. Involves but Not Limited To: Removing Existing Carpeting, and Installation of LVT Flooring.
Blythe Easement Wre Construction of 2 Earthen Berms with Pipes and Water Control Structures, for North Wetland and South Wetland
EO 14398 Security Installation
The Purpose of This Task Order Is to Replace the Data Center Cooling Located at 219 South Dearborn Street Chicago, Illinois 60604 IL0205ZZ.
Region 5, (ERRS V); Task Order for the Emergency Response at Silver Charms Way Spill (D52P).
The Contractor Shall Mow All Turfgrass to Present a Well-manicured, Neat, Professional Appearance at All Times, IN Alignment with the National Shrine Standards.
Fire Alarm Replacement, Paul Findley Federal Building, Springfield, IL the Primary Objective for the Fire Alarm Replacement Is to Replace the Existing Fire Alarm System and Its Components Due to the Age of the Fire Alarm System.
Region 5, (ERRS V); Task Order for the Emergency Response at Pickerington Residential Mercury Spill: (D52J)
Lobby and 2ND Floor Refinishing, IL0205ZZ, Everett M. Dirksen Courthouse, 219 S. Dearborn ST., Chicago, IL 60604
Aurora Annex Vehicle Gate Upgrades, Upgrading the Existing UL-325 to Safety Compliance. Period of Performance: July 13, 2026-OCTOBER 12, 2026
Stericycle - Biohazardous Waste Removal -FY26 4TH Quarter Services (JULY 2026 - September 2026)
Refill the Primary Fire Suppression Tank for the Itops Server Room at Jesse Brown.
B&F Project 26A6AT7 - Emergency-replace Elevator Drive "EO 14398"
578-M26111 Iepa Deficiency
4TH QTR Elevator Maintenance.
ADA S Mckinley to Restore Tile in (12) Restrooms (2627 SF) at the Dirksen Courthouse at 219 S Dearborn ST, Chicago, IL IL0205ZZ IT Is Line Item Work Performed Under the Custodial Contract.
Chiller Rental and Installation
Fire Alarm Monitoring