Macdonald-Miller Facility Solutions LLC · 1333MF26P0081
$55KUrgent Chiller Compressor Repair 26-501
- Agency
- National Oceanic and Atmospheric Administration
- NAICS
- 238220
- State
- WA
- Period
- Jul 16, 2026 – Sep 30, 2026
150 MLP-relevant tracked results · data from USASpending.gov · newest record 36 days old — updates delayed
Showing 1–25 of 150
Obligated amount as reported by USAspending.
Urgent Chiller Compressor Repair 26-501
Disaster Relief Construction Contract for Upgrading Two Culvert Crossings Below a Wildfire Burn Scar That Have Experienced Debris Flows and Are Washing Out the Road
Federal Emergency Management Agency Region 10 Elevator Preventive Maintenance and Repair Services for the Federal Regional Center
Replace Carpet Flooring at United States Coast Guard FD&CC Seattle, WA
Wa-fws Turnbull Nwr-storage Tank Cleanup
Tree Pruning, Removal, and Injection Services at Seattle Usch, WA.
Wa-leavenworth Nfh-pipeline Repair
Emergency Plumbing System Clog at Tacoma Union Station, WA0704ZZ
Sampling, Inspection, and Cleaning of Oily Water Separators and Catch Basins on Base Seattle.
North Fork Guard Station Roof Replacements
As Approved in Ratification Memo RAT-26-003, WE Are Requesting to Pay the Invoice for Emergency Repairs and Parts That Were Necessary to Restore the Manchester Research Station's Chiller to Normal Operating Status in Accordance with the Attached
Urgent Fix of a Large Crack in Main Sewer Drain Line That Serves Six Restrooms Requires Plumbing Services to Restore the Use of the Restrooms.
WA-26-003 Design_build French Drain
Project 668-24-102, Replace Windows at Building 1 Construction Contract to Replace PRE-1990 Exterior Windows of Building 1.
Demo and Dispose of the Existing Vault Toilet Building, Concrete Foundation, Removal of In-ground Vault, Removal of the Handpump Well and Campground Items
Annual Maintenance on Three Mine Adit Discharge Dams, Piping, Valves, Ditches and Ponds to Ensure Protection of Nearby Clear Creek. Includes Underground Entry (MSHA Certification Required). Removal Action in Late Spring/Early Summer of 2026 to Pe
This Is a Firm Fixed Price Purchase Order to Remove a Large Tree Whose Trunk Has Split, Threatening Usfws Infrastructure as IT Drops Limbs and Will Eventually Fall.
Blewett Mill Institutional Controls USDA Forest Service Okanogan-wenatchee National Forest Wenatchee River Ranger District
Wa Willard NFH Weir & Pipeline Replace
Station Bellingham HVAC Replacement for Server Room
R10 Emergency and Rapid Response Services (errs)--old Dominion Mine Removal Site Evaluation (RSE) Site Walk
R10 Emergency and Rapid Response Services (errs)-sierra Zinc Mine/Mill
0621 (COL) Rec Colville Vault Pumping
Placement of Aggregate Surfacing Which Includes Preparing Roadway Surface, Hauling, Placing Compacting and Finishing Crushed Aggregate Surfacing
Compost Service for Base Seattle to Include Base and Three Option Periods. Base Period of Performance June 2026 May 2027 Year Cost $6,468.72, $539.06 per Month Aggerate Total of Award $26,237.76