Boiler Inspection and Repairs at FLETC Cheltenham

Original title: Boiler Inspection and Repairs

HOMELAND SECURITY, DEPARTMENT OF › FEDERAL LAW ENFORCEMENT TRAINING CENTER › FLETC PROCUREMENT CHELTENHAM OFFICE

At a glance

The Department of Homeland Security seeks a small business to inspect 13 gas boilers and calibrate gas sensors at the Federal Law Enforcement Training Center in Cheltenham, MD. Work includes comprehensive assessment of burners, controls, safety systems, and piping with a line-item cost estimate for any repairs. Responses are due by September 11, 2026.

AI-generated summary — verify details in the original notice below and on SAM.gov.

Key details

Notice ID
af075679e7e94f3caf4b699232297741
Solicitation #
70LCHE26QPFB00004
Posted
Response deadline
Archive date
Sep 26, 2026
NAICS
238220 — Plumbing, Heating, And Air-Conditioning Contractors
PSC
J042 — Maint/Repair/Rebuild Of Equip- Fire Fighting/Rescue/Safety Equip; Environ Protect Equip/Matls
Set-aside
Total Small Business Set-Aside
Place of performance
Cheltenham, MD, 20623, USA
Contracting office
CHELTENHAM, MD, 20588

Description

The Contractor shall perform a comprehensive inspection of all 13 gas boilers and calibrate the associated gas sensors. The Contractor must troubleshoot any conditions found that affect the proper operation of the boilers. Bidders are responsible for verifying all site conditions and quantities prior to bid submission. The Contractor shall provide a complete inspection and troubleshooting service, which includes: Submitting a detailed assessment checklist noting all deficiencies. Providing a line-item cost estimate to correct any identified deficiencies. Ensuring the inspection covers, at a minimum: Mounting, Isolators, and Filter Components Burner and Gas Train Breeching and Combustion Air Boiler Inspection and Chemical Treatment Fan functionality Sight Glass, Water Piping, Gas Piping, and associated valves Electrical connections, including disconnect switch and safety circuits Control systems, firing sequences, and interlocks Safety controls, flame safeguards, and low water cutout Pressure and temperature gauges Testing of the safety relief valve Calibrating all gas sensors and ensuring they communicate correctly with the Building Automation System (BAS).