SolicitationTotal Small Business Set-AsideActive17 days
Bonneville Lock and Dam Navigation Lock 1 Bridge Replacement
Original title: Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
DEPT OF DEFENSE › DEPT OF THE ARMY › W071 ENDIST PORTLAND
At a glance
The U.S. Army Corps of Engineers seeks a small business to replace the existing navigation lock bridge with a new single-span steel girder bridge on a revised alignment at Bonneville Lock and Dam near Cascade Locks, Oregon. Work includes partial demolition of the old bridge, phased construction to maintain vehicular access, lead and asbestos abatement, and operations near high-voltage power lines under environmental and seasonal restrictions. Proposals are due by September 18, 2026.
AI-generated summary — verify details in the original notice below and on SAM.gov.
Key details
- 307e98f9a2944d449d0e77660515abcd
- W9127N26BA024
- Oct 3, 2026
- 237310 — Highway, Street, And Bridge Construction
- Y1LB — Construction Of Highways, Roads, Streets, Bridges, And Railways
- Total Small Business Set-Aside
- Cascade Locks, OR, 97014, USA
- PORTLAND, OR, 97204-3495
Description
*** 27 August 2026 - Amendment W9127N26BA0240001 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement*** This amendment inserts additional Government Furnished Information (GFI) as an attachment to the solicitation. The file “Power Line Layout” is provided for the Contractor’s information. The Government shall not be responsible for any interpretation of, or conclusion drawn, from the data or information by the Contractor. Information provided should be field verified by the Contractor. If there is a discrepancy between the solicitation plan set and the GFI, the solicitation plan set takes precedence. The project consists of replacing the existing bridge with a new fixed bridge on a new alignment and to provide for partial demolition of the existing bridge. The new fixed bridge will be a single-span steel girder bridge with a concrete deck. The bridge width will be 34’4½” out-to-out, with two 11’0” travel lanes, two 2’0” shoulders, a 5’0” sidewalk, and the superstructure will consist of four (4) built-up steel plate girders. The replacement bridge alignment is located immediately downstream of the existing bridge and, at its northern terminus, will fit entirely between the existing bridge and the Bonneville Power Administration transmission tower which is located to the south. Approach roadways will also be constructed to tie into the existing roadway alignment. The new fixed bridge will be located over the existing navigation channel and will provide an under clearance that is larger than is currently present under the existing bridge. The north abutment will be a concrete stub abutment with spread footing anchored into rock. The south abutment will be a concrete abutment that is supported by drilled shafts. To mitigate seismic hazards, portions of the existing bridge will be removed as part of the bridge construction requirement. The existing bridge provides for critical vehicular access to the Bonneville project that must remain open for the entirety of the construction project. This will likely require the contractor to construct the project in phases. In addition, lead and asbestos removal will be required as part of this requirement. Working within environmental and seasonal restrictions and barge crane lifting will be required in close proximity to a high voltage power line will also be necessary during performance of the required work.
Documents 4
- 20260827_BN NL Bridge pre bid site visit attendance list.pdf789 KB
- Power Line Layout.pdf7.0 MB
- BN1ONLB27_SPECS_ADVERTISE.pdf80.8 MB
- Bonneville Navigation Lock 1 Bridge Replacement_Drawings_ADVERTISE-EDITED.pdf117.7 MB