SolicitationTotal Small Business Set-AsideActive9 days
A newer notice for solicitation 191BWC26B0013 was posted on Aug 22, 2026. Country Club West Stoplog Rehabilitation — El Paso, TX (Total Small Business Set-Aside)
Country Club Bridge West Stoplog Structure Rehabilitation
Original title: Country Club west Stoplog Rehabilitation
At a glance
The USIBWC seeks a small business to rehabilitate the Country Club Bridge West Stoplog Structure in El Paso, TX, including expansion joint replacement, concrete repair, and roadway restoration. The firm fixed-price contract is estimated between $25,000 and $100,000. A mandatory pre-bid conference and site visit is scheduled for August 18, 2026, with attendance confirmation due by August 17, 2026.
AI-generated summary — verify details in the original notice below and on SAM.gov.
Key details
- 3a53943b32724e729fc11f2387d1a7a3
- 191BWC26B0013
- Sep 25, 2026
- 237310 — Highway, Street, And Bridge Construction
- Y1PZ — Construction Of Other Non-Building Facilities
- Total Small Business Set-Aside
- El Paso, TX, 79902, USA
- El Paso, TX, 79902
Description
Added SF 1442 to attachements The United States Section of the International Boundary and Water Commission (USIBWC) requires rehabilitation of the Country Club Bridge West Stoplog Structure located in El Paso, TX. The project includes mobilization, traffic control, removal and replacement of the existing expansion joint, repair of deteriorated concrete, roadway restoration, disposal of construction debris, and final cleanup. These repairs are necessary to restore movement between the roadway and stoplog structure, reduce continued deterioration, and maintain a safe and serviceable bridge approach. See attachments Standard Form 1442 will be added by amendment. The Contractor shall furnish all labor, material, and equipment necessary to complete Country Club West Stoplog Rehabilitation. This is a FIRM FIXED PRICE CONTRACT.The estimated magnitude of this project will be $25,000.00 to $100,000.00. L.01 - Pre-Bid Conference and Site Visit L.01.A. All potential bidders are requested to attend the Pre-Bid Conference/Site Visit to be held at: USIBWC AmericanDam Field Office, Conference Room, 2616 W Paisano Dr., El Paso, TX 79922 Tuesday, August 18, 2026, at 9:30 AMMDT. L.01.B. Names of individuals who plan to attend shall be furnished before 12:00 PM MDT on Monday, August 17, 2026 byemail submission to Philip.johnson@ibwc.gov .
Documents 16
- 191BWC26B0013 SF 1442.pdf137 KB
- Sunland Bridge West Stoplog Shop Dwg_Flood Control Intl.pdf494 KB
- Wage Determination Highway TX20260293 20260518.pdf196 KB
- Arcadis_Sunland Levee Repair Design Report_20220204.pdf47.1 MB
- Excerpts 191BWC22C0011 Sunland Levee Dwgs.pdf17.7 MB
- 191BWC26B0013 CC West Stoplog Rehab Drawings 20260806.pdf7.7 MB
- Country Club West Rehab_Damage Report_USIBWC_20260610.pdf4.5 MB
- 191BWC26B0013 CC West Stoplog Rehab Specs 20260806.pdf2.5 MB
- IBWC22M0005 MOA Country Club Floodgates.pdf1.0 MB
- FXSA_Survey Report_20220303.pdf268 KB
- Country Club West_Repair Recommendation_Arcadis_20250808.pdf318 KB
- IBWC_Form_110_Cert_of_Authority_for_Signing.pdf217 KB
- IBWC Form 245 Minimum Quals for Award.docx58 KB
- IBWC Form 245B Backup Information.pdf60 KB
- IBWC Form 245A Minimum Quals for Award-Joint Venture.docx54 KB
- IBWC_Form_116_Statement_of_Equipment.pdf19 KB
Files download directly from SAM.gov.