A newer notice for solicitation 36C77626B0026 was posted on Aug 31, 2026. EHRM Infrastructure Upgrades and Data Center Construction at Gainesville VAMC
EHRM Infrastructure Upgrades and Data Center Construction at Gainesville VAMC
Original title: Y1DA--573-21-106 EHRM Infrastructure Upgrades and Data Center Construction - Gainesville VAMC
VETERANS AFFAIRS, DEPARTMENT OF › VETERANS AFFAIRS, DEPARTMENT OF › PCAC (36C776)
At a glance
The Department of Veterans Affairs seeks a contractor to upgrade Electronic Health Record Management infrastructure and construct a data center at the Gainesville VA Medical Center in Florida. This procurement is set aside for Service-Disabled Veteran-Owned Small Businesses. Proposals are due by September 9, 2026.
AI-generated summary — verify details in the original notice below and on SAM.gov.
Key details
- c52d86e58f44401c9046f5d30059c2bf
- 36C77626B0026
- Mar 15, 2027
- 236220 — Commercial And Institutional Building Construction
- Y1DA — Construction Of Hospitals And Infirmaries
- Service-Disabled Veteran-Owned SB Set-Aside
- Gainesville, FL, 32608, USA
- INDEPENDENCE, OH, 44131
Description
Documents 20
- 36C77626B0026 0004.pdf184 KB
- Technical Questions Spreadsheet - Gainesville - 8-27-26.docx683 KB
- 36C77626B0026 0003.pdf184 KB
- Technical Questions Spreadsheet - Gainesville - 8-24-26.docx680 KB
- 36C77626B0026 0002.pdf173 KB
- 36C77626B0026 0001.pdf131 KB
- Site Visit Sign-in Sheet - Gainesville.pdf1.1 MB
- 36C77626B0026.pdf749 KB
- Attachment 1 - Specifications.pdf45.1 MB
- Attachment 2 - Drawings Volume 01.pdf33.9 MB
- Attachment 3 - Drawings Volume 02.pdf70.7 MB
- Attachment 4 - Drawings Volume 03.pdf59.2 MB
- Attachment 5 - Narrative.pdf4.7 MB
- Attachment 6 - GNV EHRM - Phasing Plan - 260618.pdf101 KB
- Attachment 7 - VHA ICRA-1.4 - April 14 2026 - 0.pdf378 KB
- Attachment 8 - VHA PCRA-1.1 - May 21 2024 -MAY-2026.pdf253 KB
- Attachment 9 - Brand Name Justification - Redacted.pdf100 KB
- Attachment 10 - Limitations on Subcontracting - Construction.docx18 KB
- Attachment 11 - Construction Wage Rates - Alachua - 05-18-26.pdf172 KB
- Attachment 12 - Site Visit Instructions.pdf695 KB
Files download directly from SAM.gov.