Skip to main content
Pragmonica
SolicitationService-Disabled Veteran-Owned SB Set-AsideActive10 days

A newer notice for solicitation 36C24626B0039_1_ was posted on Aug 6, 2026. Extend Chilled Water to Hospice and Audiology Buildings

Extend Chilled Water to Hospice and Audiology (Service-Disabled Veteran-Owned Small Business Set-Aside)

Original title: Z2NZ--659-24-203: Extend Chilled Water to Hospice and Audiology

VETERANS AFFAIRS, DEPARTMENT OF › VETERANS AFFAIRS, DEPARTMENT OF › 246-NETWORK CONTRACTING OFFICE 6 (36C246)

At a glance

The Department of Veterans Affairs seeks a Service-Disabled Veteran-Owned Small Business to extend chilled water service from Building 31 to Buildings 42 and 43 at the Salisbury, NC medical center. Work includes installing new pumps in Building 42 and integrating valves with the Building Management System for automated operation. Proposals are due September 11, 2026.

AI-generated summary — verify details in the original notice below and on SAM.gov.

Key details

Notice ID
40bc859fb9e74b36b3aaaaca76d466e9
Solicitation #
36C24626B0039_1_
Posted
Response deadline
Archive date
Sep 26, 2026
NAICS
238220 — Plumbing, Heating, And Air-Conditioning Contractors
PSC
Z2NZ — Repair Or Alteration Of Other Utilities
Set-aside
Service-Disabled Veteran-Owned SB Set-Aside
Place of performance
Salisbury, NC, 28144, USA
Contracting office
HAMPTON, VA, 23667

Description

Provide chilled water from the building 31 primary chiller to serve Buildings 42 and 43, bypassing the existing chillers in 42 and 43 during normal operation. Normal Operation (Primary from Building 31) • Building 42 and Building 43 are served directly from building 31 chilled-water plant. • The existing chillers for 42 and 43 are isolated and not in use. • Valves and actuators shall be connected to the Building Management System (BMS) and automatically controlled for mode selection. Bypass Mode (Local Chillers in Service) • Building 42: The existing chiller serves the 2" chilled-water line supplying Audiology. Glycol shall be replenished through the pot feeder. • Building 43: The existing chiller serves the 3" chilled-water line supplying the building. Glycol shall be replenished through the pot feeder. New Work / Modifications • Install additional pumps in Building 42 to serve the 2" chilled-water line to Audiology.

Documents

No public attachments listed — view documents on SAM.gov ↗