Skip to main content
Pragmonica
Solicitation8(a) Set-AsideActive28 days

Fort Lee Vehicle Recovery Range Construction

Original title: Fort Lee Vehicle Recovery Range

DEPT OF DEFENSE › DEPT OF THE ARMY › W2SD ENDIST NORFOLK

At a glance

The Army seeks an 8(a) small business to construct 24 concrete turning pads with drainage and road improvements at Fort Lee, VA, in three sequential phases. Work includes excavation, concrete placement, storm drainage installation, and road realignment; later phases are options. Proposals are due by September 29, 2026.

AI-generated summary — verify details in the original notice below and on SAM.gov.

Key details

Notice ID
f46186008fd74b78a4b34dda5272802e
Solicitation #
W9123626BA006
Posted
Response deadline
Archive date
Aug 25, 2027
NAICS
236220 — Commercial And Institutional Building Construction
PSC
Y1PZ — Construction Of Other Non-Building Facilities
Set-aside
8(a) Set-Aside
Place of performance
Fort Lee, VA, USA
Contracting office
NORFOLK, VA, 23510-1096

Description

Amendment 0005: An amendment has been made to Solicitation W9123626BA0006. Please see attachment SF30, Solicitation Amendment W9123626BA006_0005. This amendment incoporates the correct solicitaion documents dated May 26, 2026 to replace the previous inadvertently issued solicitation documets dated November 2025. This amendment also reopens ProjNet and extends the bid due date and bid opening date. Please see the amendment for the complete summary of change. The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.

Documents 3

Files download directly from SAM.gov.