Skip to main content
Pragmonica
Combined Synopsis/SolicitationTotal Small Business Set-AsideActive3 days

Full Start-Up Commissioning of Data Center Cooling Infrastructure and UPS Battery Replacement

DEPT OF DEFENSE › DEPT OF THE ARMY › W4LD USA HECSA

At a glance

The U.S. Army Corps of Engineers Headquarters seeks a small business to commission existing data center cooling systems per original specifications and replace and dispose of Eaton UPS batteries with EPA compliance. Work occurs at the Cude Building 2592 in Alexandria, VA. A mandatory site visit is scheduled for September 1; quotes are due by September 4, 2026.

AI-generated summary — verify details in the original notice below and on SAM.gov.

Key details

Notice ID
ea30183e54554c91abd78a7b4f634011
Solicitation #
W912HQ26S0066
Posted
Response deadline
Archive date
Sep 19, 2026
NAICS
238210 — Electrical Contractors And Other Wiring Installation Contractors
PSC
M1EB — Operation Of Maintenance Buildings
Set-aside
Total Small Business Set-Aside
Place of performance
Alexandria, VA, 22315, USA
Contracting office
ALEXANDRIA, VA, 22315-3860

Description

The U.S. Army Corps of Engineers Headquarters has a requirement to to execute the full start-up and commissioning of existing data center environmental control systems based on original design specifications, as well as the replacement and EPA-compliant disposal of batteries for an Eaton Uninterruptible Power Supply (UPS) system.This procurement will be awarded under Simplified Acquisition Procedures. There will be one site visit at the Cude Building 2592 on Tuesday, 1 September. The site visit is required. All contractors will need to meet at the CUDE Building 2592, 7701 Telegraph Road, Alexandria, Virginia 22315 for check-in beginning at 0900. All contractors who wish to be at the site visit must send their names, phone numbers, and company names to the Contract Specialist, Rick Klein, via email. All contractors must be US Citizen or US National and possess a valid Government ID. Must have driver license to enter Facilities. It is the Offeror’s responsibility to ensure the quote has been received by the contracting office via email. Fax quotes will not be accepted. Late quotes will be processed in accordance with RFO 52.212-1(c) “Late submission, modifications, revisions, and withdrawals of offers.” Upon receipt of the electronic offer, the Government will acknowledge receipt of that offer via email to the Offeror.

Documents 2

Files download directly from SAM.gov.