SolicitationTotal Small Business Set-AsideActive7 days
A newer notice for solicitation 36C25026Q0789 was posted on Aug 31, 2026. FY26 NRM: Install Analog Phone Line to Building 6 (Fort Wayne, IN)
FY26 NRM - Install Analog Phone Line to Building 6 at Fort Wayne VA
Original title: 7G20--FY26 NRM - Install Analog Phone Line to Building 6 - 610A4-26-510
At a glance
The VA Network Contract Office 10 seeks a small business to furnish and install approximately 700 feet of 25-pair CAT 3 cable between Buildings 3 and 6 at the Fort Wayne, IN campus. Work includes cable removal, termination, confined-space vault access, and firestopping restoration over a 60-day performance period. Responses are due by September 8, 2026.
AI-generated summary — verify details in the original notice below and on SAM.gov.
Key details
- 28389bc39fa343a3960a67dafaa5de21
- 36C25026Q0789
- Sep 23, 2026
- 238210 — Electrical Contractors And Other Wiring Installation Contractors
- 7G20 — It And Telecom - Network: Analog Voice Products (Hardware And Perpetual License Software)
- Total Small Business Set-Aside
- Fort Wayne, IN, 46805, USA
- DAYTON, OH, 45428
Description
This is a total small business (SB) set aside . The agency seeks information from interested, eligible, and qualified small businesses for execution of this project. Proposals are being requested or accepted at this time. This is a solicitation, and a contract will be awarded based on this synopsis. Please see the notices below and follow the information on the SF1442. THE PROJECT REQUIREMENTS: The contractor will provide all labor, equipment, materials, and supervision required to furnish and install cabling to reconnect the pedestrian blue call pole communication line between Buildings 3 and 6 to the VA system at 2121 Lake Avenue, Fort Wayne, IN 46805. I. SPECIFIC: To include: Remove the old cable that is being replaced. Install a new 25-pair CAT 3 cable from the OIT Telecommunication Room in the basement of Building 3 to the basement of Building 6, approximately 700 feet in length Terminate all pairs of the new cable at both ends, connecting to the existing 100-pair Building Entrance Protect in Building 3 and the 66-block in Building 6 The cable pathway between buildings will use the existing duct bank, which includes multiple permitted confined-space underground access vaults for cable installation Firestopping material in the OIT Telecommunication Room must be removed to install the cable and then properly restored The period of performance is 60 days after signed notice to proceed.
Documents 12
- 36C25026Q0789_1.pdf398 KB
- ATTACHMENT I - WAGE DETERMINATION..pdf1.3 MB
- ATTACHMENT II - DRAWINGS.pdf256 KB
- ATTACHMENT III - VHA DIRECTIVE 1192.01.pdf334 KB
- ATTACHMENT IV - RFI FORM - 36C25026Q0789.pdf103 KB
- ATTACHMENT V - MINIMUM PROPERTY_REQUIREMENTS.pdf566 KB
- ATTACHMENT VI - FIRESTOPPING.pdf22 KB
- ATTACHMENT VII - COMMUNICATIONS INSTALLATIONS.pdf283 KB
- ATTACHMENT VIII - PHONE LINE.pdf1.0 MB
- ATTACMENT IX - SIGNAL WIRING.pdf82 KB
- ATTACHMENT X - CABLING.pdf165 KB
- ATTACHMENT VHA DIRECTIVE 1192.01.pdf334 KB
Files download directly from SAM.gov.