Skip to main content
Pragmonica
Combined Synopsis/SolicitationTotal Small Business Set-AsideActive22 days

GAOA Kents Lake Campground Reconstruction, Fishlake National Forest, Utah

Original title: GAOA Kents Lk. CG Reconstruction, Fishlake NF, Utah

AGRICULTURE, DEPARTMENT OF › FOREST SERVICE › USDA FOREST SERVICE

At a glance

The Forest Service seeks a small business to reconstruct Kent's Lake Campground in the Fishlake National Forest near Beaver, Utah. Work includes demolition, new concrete features, upgraded campsites, water and sewer improvements, road and drainage enhancements, retaining walls, fencing, signage, and site restoration. Proposals are due by September 23, 2026.

AI-generated summary — verify details in the original notice below and on SAM.gov.

Key details

Notice ID
559dca0e0deb47d5bbfb7cf8c9b8ee2b
Solicitation #
1240LT26Q0106
Posted
Response deadline
Archive date
Oct 8, 2026
NAICS
237990 — Other Heavy And Civil Engineering Construction
PSC
Z2LB — Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways
Set-aside
Total Small Business Set-Aside
Place of performance
Beaver, UT, 84713, USA
Contracting office
WASHINGTON, DC, 20250

Description

On August 19, 2026, amendment 0001 to solicitation 1240LT26Q0106 - GAOA Kents Lk. CG Reconstruction, Fishlake National Forest has been posted to SAM.gov and accomplished the following: Post updated SOI labeled C04a Attachment 1 SOI 1240LT26Q0106. This SF30 must be acknowledged and submitted with your proposal. ************************************************************************************************************************************************* The Kent’s Lake Campground Reconstruction Project, part of the Great American Outdoors Act (GAOA) program, will restore the campground’s natural environment while updating facilities to support increasing recreational use and modern vehicle requirements. The work includes demolition of existing structures, installation of new concrete features, upgraded family and tent campsites, improved water and sewer infrastructure, roadway and drainage enhancements, rock and retaining wall construction, fencing and gates, new signage, and site restoration including grading, surfacing, and seeding. The project aims to enhance visitor safety, accessibility, and resource protection while preserving the forest’s natural character.

Documents 9

Files download directly from SAM.gov.