Skip to main content
Pragmonica
SolicitationClosedDeadline passed

A newer notice for solicitation 47PB5126R0024 was posted on Aug 27, 2026. Harry S Truman Streetscape Perimeter Construction Project

Harry S Truman Streetscape Perimeter Construction Project

GENERAL SERVICES ADMINISTRATION › PUBLIC BUILDINGS SERVICE › PBS PROJECT DELIVERY CAPITAL CONSTRUCTION - BRANCH NORTHEAST

At a glance

GSA seeks a construction contractor to replace temporary security measures with permanent perimeter countermeasures around the Harry S Truman Building in Washington, DC. The project covers roughly 162,000 square feet of civil and streetscape work in four phases. Responses are due by September 1, 2026.

AI-generated summary — verify details in the original notice below and on SAM.gov.

Key details

Notice ID
44e68a762e8845cd909a48e32f9f0653
Solicitation #
47PB5126R0024
Posted
Response deadline
Archive date
Sep 16, 2026
NAICS
23622
PSC
Z2LB — Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways
Place of performance
Washington, DC, 20520, USA
Contracting office
Washington, DC, 20405

Description

The General Services Administration (GSA), Public Buildings Service (PBS) New England Region, Acquisition Management Division intends to hire a construction contractor to implement and enhance security and esthetics for the area around the Harry S Truman (HST) Streetscape Construction building located in Washington DC. The project originated in response to the events of 9/11 where high-profile government buildings were targeted by terrorists. This major renovation project will replace the temporary security measures surrounding the building to provide countermeasures that will secure the building, protect employees and visitors, and improve the surrounding streetscape by creating an attractive and accessible environment for pedestrians. Once complete, the temporary security measures will be replaced with tested and proven countermeasures that will secure the building, protect employees and visitors, and improve the surrounding streetscape by creating an attractive and accessible environment for pedestrians. The project involves civil/site construction of approximately 162,000 square feet of streetscape (sidewalks, curb & gutter, utilities, etc.), requiring 4 phases for completion. Documents Updates (Non-Amendments): 11 June 2026: HST Streetscape Perimeter Construction Project- Pre-Proposal Conference Meeting Minutes & Site Visit Sign-In Sheet Dated 03 June 2026 30 June 2026: HST Streetscape Perimeter Construction Project - Site Visit Listing Dated 03 June 2026 Amendment Posted: Amendment 0001 Posted on 30 June 2026 Amendment 0002 Posted on 15 July 2026 Amendment 0003 Posted on 05 August 2026

Documents 17

Files download directly from SAM.gov.