SolicitationClosedDeadline passed
A newer notice for solicitation 47PB5126R0024 was posted on Aug 27, 2026. Harry S Truman Streetscape Perimeter Construction Project
Harry S Truman Streetscape Perimeter Construction Project
At a glance
GSA seeks a construction contractor for phased streetscape security upgrades around the Harry S Truman Building in Washington, DC. Work covers approximately 162,000 square feet of civil and site construction to replace temporary barriers with permanent countermeasures. Responses are due by September 1, 2026.
AI-generated summary — verify details in the original notice below and on SAM.gov.
Key details
- d4a2a7a871d54ae9abb3c913d76ea734
- 47PB5126R0024
- Sep 16, 2026
- 23622
- Z2LB — Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways
- Washington, DC, 20520, USA
- Washington, DC, 20405
Description
The General Services Administration (GSA), Public Buildings Service (PBS) New England Region, Acquisition Management Division intends to hire a construction contractor to implement and enhance security and esthetics for the area around the Harry S Truman (HST) Streetscape Construction building located in Washington DC. The project originated in response to the events of 9/11 where high-profile government buildings were targeted by terrorists. This major renovation project will replace the temporary security measures surrounding the building to provide countermeasures that will secure the building, protect employees and visitors, and improve the surrounding streetscape by creating an attractive and accessible environment for pedestrians. Once complete, the temporary security measures will be replaced with tested and proven countermeasures that will secure the building, protect employees and visitors, and improve the surrounding streetscape by creating an attractive and accessible environment for pedestrians. The project involves civil/site construction of approximately 162,000 square feet of streetscape (sidewalks, curb & gutter, utilities, etc.), requiring 4 phases for completion. Documents Updates (Non-Amendments): 11 June 2026: HST Streetscape Perimeter Construction Project- Pre-Proposal Conference Meeting Minutes & Site Visit Sign-In Sheet Dated 03 June 2026 30 June 2026: HST Streetscape Perimeter Construction Project - Site Visit Listing Dated 03 June 2026 Amendment Posted: Amendment 0001 Posted on 30 June 2026 Amendment 0002 Posted on 15 July 2026 Amendment 0003 Posted on 05 August 2026 Amendment 0004 Posted on 10 August 2026
Documents 18
- 47PB5126R0024_0004 Amendment SF30 2026 08 10.pdf554 KB
- 47PB5126R0024_0003 Amendment SF30 2026 08 05.pdf663 KB
- 47PB5126R0024_0002 Amendment SF30 2026 07 15.pdf593 KB
- 47PB5126R0024_0001 Amendment SF30 2026 06 30.pdf568 KB
- 21) HST Streetscape 95 CD Drawing Table of Contents 2026 06 22.pdf109 KB
- 47PB5126R0024 HST Streetscape Perimeter Construction Project - Site Visit Listing 2026 06 03.pdf134 KB
- 47PB5126R0024 HST Streetscape Perimeter Constructin Pre-Proposal Conference Meeting Minutes 2026 06 09.pdf212 KB
- 47PB5126R0024 HST Streetscape Perimeter Construction Site Visit Sign-In Sheets 2026 06 10.pdf233 KB
- 16) PROJNET Instructions 2026 02 17.pdf543 KB
- 19) CD_Waste_Management_Plan__Reporting_Template 2026 05 12.xlsx351 KB
- 17) GACA GSAAffiliatedCustomerAccounts 2023 02 02.pdf176 KB
- 15) NDA_Document_Security 2026 02 17.pdf107 KB
- 5) GSA527 2025 11 18 .pdf897 KB
- 8) PBS PPQ 2023 11 29.pdf574 KB
- 9) Tips on Preparing Subcontracting Plan 2026 04 15.pdf247 KB
- 3) GSA Pricing Bid Form 2026 04 22 .xlsx308 KB
- 10) Model Subcontracting Plan 2026 04 15.docx65 KB
- 6) Proprietary Information Agreement 2026 04 22 .docx18 KB
Files download directly from SAM.gov.