Skip to main content
Pragmonica
SolicitationHUBZone Set-AsideActive10 days

A newer notice for solicitation 47PC5226Q0134 was posted on Aug 27, 2026. Installation of Commercial Inbound Gate at Houlton Land Port of Entry

Installation of Commercial Gate - Houlton, Maine

GENERAL SERVICES ADMINISTRATION › PUBLIC BUILDINGS SERVICE › PBS PROJECT DELIVERY EAST - BRANCH B

At a glance

The General Services Administration seeks a contractor to install a 24-foot wide double-arm commercial gate with a heated operating system at the Houlton, Maine Land Port of Entry. This is a HUBZone set-aside solicitation; work will be performed in Houlton, ME. Responses are due by September 11, 2026.

AI-generated summary — verify details in the original notice below and on SAM.gov.

Key details

Notice ID
0772203cf50e4b40b8659bfd5736ae6b
Solicitation #
47PC5226Q0134
Posted
Response deadline
Archive date
Sep 26, 2026
NAICS
236220 — Commercial And Institutional Building Construction
PSC
Z2AA — Repair Or Alteration Of Office Buildings
Set-aside
HUBZone Set-Aside
Place of performance
Houlton, ME, 04730, USA
Contracting office
Washington, DC, 20405

Description

Department of Homeland Security determined the need for an Inbound gate to be installed at the Land Port of Entry located at Houlton Maine. This gate shall be a double arm gate that is 24 feet wide, with a heated operation system to withstand the harsh temperatures of Houlton Maine. The following features need to be included: Traffic light mounted per design and wired in sequence with the gate operations, light up gate arms (green up, red down), safety closer sensor, and gate must have upright lock capabilities. This gate will need to be hard wired to the panel that is on backup power. The gate operation mechanism will need to be a hard wire switch to the CBP officer booth within arm’s reach of the booth window.

Documents 6

Files download directly from SAM.gov.