Combined Synopsis/SolicitationTotal Small Business Set-AsideActive9 days
Lenel OnGuard Door Access Control System Upgrade – Amendment 0001
Original title: Amendment 0001 Lenel OnGuard Door Access Control System Upgrade
DEPT OF DEFENSE › DEPT OF THE ARMY › W6QM MICC-FT RILEY
At a glance
The Army's Mission and Installation Contracting Command at Fort Riley issued Amendment 0001 to add a mandatory site visit and updated justification documents for the Lenel OnGuard door access control system upgrade. This is a total small business set-aside with work performed at Fort Riley, Kansas. Responses are due by September 10, 2026, at 3:00 PM UTC.
AI-generated summary — verify details in the original notice below and on SAM.gov.
Key details
- 75dd8f43ba6e4abf8e9ee9f7785340d0
- W911RX26QA050
- Sep 25, 2026
- 561621 — Security Systems Services (Except Locksmiths)
- K063 — Modification Of Equipment- Alarm, Signal, And Security Detection Systems
- Total Small Business Set-Aside
- Fort Riley, KS, 66442, USA
- FORT RILEY, KS, 66442-0248
Description
The purpose of this Amendment to the Combined Synopsis / Solicitation is to notify potential Offerors of a scheduled Site Visit, provide details of the Site Visit, and add Attachment-5, SIte Visit Strip Map. Additionally, RFO FAR Part 12 Justification and Approval is updated to the new Procuring Contarcting Officer IAW RFO FAR guidance. The updated and redacted J&A is atatched.
Documents 9
- Solicitation Amendment W911RX26QA0500001 SF 30.pdf3.8 MB
- Solicitation - W911RX26QA050.pdf3.2 MB
- RFO Part 12 JA (13Aug2026) W911RX26QA050_Redacted.pdf777 KB
- Attachment 1 PWS_W911RX26QA050 v1.pdf305 KB
- Attachment 2 Purchase Description Lenel W911RX26QA050.pdf68 KB
- Attachment 3 IACH Electronic Locks Floor Plans.pdf4.1 MB
- Attachment 4 SCA WD (2015-6015 Rev5 Geary Co).pdf251 KB
- Attachment-5_Site Visit Strip Map W911RX26QA050.pdf330 KB
- Exhibit A (TE1) Electronic Locks Floor Plan.xlsx27 KB
Files download directly from SAM.gov.