PresolicitationTotal Small Business Set-AsideActive9 days
MSANG CRTC 125kW Cummins Generator and Automatic Transfer Switch Installation
Original title: MSANG CRTC 125kW Generator and ATS
DEPT OF DEFENSE › DEPT OF THE ARMY › W7NH USPFO ACTIVITY MSANG CRTC
At a glance
The Mississippi Air National Guard seeks a small business to procure, deliver, install, and test a 125kW diesel backup generator with a 1200Amp automatic transfer switch and associated wiring for Building 70 at the Combat Readiness Training Center in Gulfport, MS. This is a total small business set-aside. Quotations are due by September 10, 2026, with award anticipated September 25, 2026, subject to fund availability.
AI-generated summary — verify details in the original notice below and on SAM.gov.
Key details
- 6786d74d79db4ec48e9aca2c51ba9a85
- W50S7K26QA010
- Sep 25, 2026
- 238210 — Electrical Contractors And Other Wiring Installation Contractors
- N061 — Installation Of Equipment- Electric Wire And Power Distribution Equipment
- Total Small Business Set-Aside
- Gulfport, MS, 39507, USA
- GULFPORT, MS, 39507-4324
Description
Pre-Solicitation Notice POC: Mr. James Nelson: james.nelson.78@us.af.mil (228)-214-6072 MSgt Andrew Cates: andrew.cates.2@us.af.mil (228) 214- 6157 Set-Aside: Total Small Business Set-Aside PSC Code: N061 NAICS Code: 238210 Description of Requirements: This solicitation is for the installation of a 125kW Cummins Generator and associated equipment. The objective is the procurement, delivery, installation, integration, and testing of one (1) 125kW Diesel Backup Generator, one (1) 1200Amp Automatic Transfer Switch (ATS), and associated copper conductors to support emergency power requirements for Building 70 (BLDG 70) at the Mississippi Air National Guard Combat Readiness Training Center (CRTC), Gulfport, Mississippi. The contractor shall provide all necessary equipment, materials, labor, and supervision. 52.232-18 Availability of Funds. Availability of Funds (Apr 1984) Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer. All responsible sources may submit a quotation. Anticipated Award Date: September 25th 2026
Documents 1
Files download directly from SAM.gov.