Combined Synopsis/SolicitationTotal Small Business Set-AsideActive7 days
Multiple Trail Bridges Replacement Project Phase 2
AGRICULTURE, DEPARTMENT OF › FOREST SERVICE › USDA-FS, CSA EAST 12
At a glance
The Forest Service seeks a small business to construct seven trail bridges, repair one embankment slope failure, and build a boardwalk platform with ramp in the Chattooga River Ranger District near Lakemont, GA. This total small business set-aside (NAICS 237310, $45M size standard) has a magnitude between $1 million and $5 million. Quotations are due September 8, 2026 at 12:00 PM ET.
AI-generated summary — verify details in the original notice below and on SAM.gov.
Key details
- eae7d9ac63d6455faea45d812b4a4198
- 12445226Q0033
- Nov 1, 2026
- 237310 — Highway, Street, And Bridge Construction
- Z1LB — Maintenance Of Highways/Roads/Streets/Bridges/Railways
- Total Small Business Set-Aside
- Lakemont, GA, USA
- Atlanta, GA, 303092449
Description
August 14, 2026 Amendment 1 is now posted in the Attachments section of this posting. The purpose of this amendment is to: Post the answers to the questions that were submitted by the due date stated in the solicitation; Remove Lake Russell Trail Bridge M.P. 2.18 from the solicitation requirements. All associated documents have been revised to reflect this change and are located in the Attachment section of the sam.gov posting. All attachment numbers will remain the same and will be updated once the requirement has been awarded; Revise the Disclosure of Magnitude of Construction Projects to: ? Between $1,000,000 and $5,000,000; Upload NEPA Report as an addendum in the Attachments section of the sam.gov posting; and Extend the quote submittal due date from September 1, 2026 to September 8, 2026 at 12:00 PM ET. -------------------------------------------------------------------------------------------------------- July 22, 2026 Offerors are highly encouraged to attend the site visit on July 28, 2026 at 7:00 AM. See Attachment 7- Site Visit Information- Trail Bridges Project for further details. Please submit your RSVP via email to Jalisa.sims@usda.gov. -------------------------------------------------------------------------------------------------------- July 7, 2026 This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 12445226Q0033 is issued as a Request for Quotation (RFQ) for constructing (7)- new trail bridges, reconstruction of (1)- trail embankment fill slope failure repair, and new construction of (1) - Boardwalk platform with ramp that shall tie into the new Lake Russell M.P. 2.18 trail bridge in the Chattooga River Ranger District of the Chattahoochee-Oconee National Forest. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237310 – Highway, Street, and Bridge Construction The small business size standard is $45,000,000.00. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. Disclosure of Magnitude of Construction Projects: ? Less than $25,000. ? Between $25,000 and $100,000. ? Between $100,000 and $250,000. ? Between $250,000 and $500,000. ? Between $500,000 and $1,000,000. ? Between $1,000,000 and $5,000,000. ? Between $5,000,000 and $10,000,000. ? More than $10,000,000.
Documents 11
- SF 1442-12445226Q0033 Multiple Trail Bridges.pdf171 KB
- C05_ Amendment 1-12445226Q0033 Multiple Trail Bridges.pdf432 KB
- C05_Revised Solicitation 12445226Q0033 Multiple Trail Bridges Replacement Project Phase 2.pdf357 KB
- C05_Attachment 1- Revised Schedule of Items_Phase 2.xlsx21 KB
- C05_Attachment 2- Revised Statement of Work - CRRD Trail Bridges Phase 2.pdf306 KB
- C05_Attachment 4- Revised 100_ Drawings_TS Zeta Multiple Trail Bridges Project.pdf17.0 MB
- C04_Attachment 6- Davis Bacon Wage Determination- Madison County.pdf60 KB
- C04 Attachment 7- Site Visit Information- Trail Bridges Project.pdf192 KB
- C04_Attachment 8- Past Performance Questionnaire.pdf165 KB
- C04_ Attachment 9- FSSS Specifications-Multiple Trail Bridges.pdf423 KB
- C05_Addendum 1_2021 NEPA Report for TS Trail Bridges Project.pdf1.7 MB
Files download directly from SAM.gov.