Combined Synopsis/SolicitationTotal Small Business Set-AsideActive17 days
MXDP 23-5000: Renovate Silver Wings Building 308
Original title: MXDP 23-5000 Renovate Silver Wings, B308
DEPT OF DEFENSE › DEPT OF THE AIR FORCE › FA3099 47 CONF CC
At a glance
The Air Force seeks a small business to renovate the Silver Wings facility (Building 308) at Laughlin AFB, Texas, under a firm-fixed-price contract. Work includes a total refresh with upgrades to seating, paint, flooring, window tinting, and kitchen reconfiguration. Quotations are due by September 18, 2026, with a mandatory site visit on August 28, 2026.
AI-generated summary — verify details in the original notice below and on SAM.gov.
Key details
- 8de1e5622daf4b899c6cf15a8878c28b
- FA309926Q0022
- Oct 3, 2026
- 236220 — Commercial And Institutional Building Construction
- Z2FD — Repair Or Alteration Of Dining Facilities
- Total Small Business Set-Aside
- Laughlin AFB, TX, 78843, USA
- LAUGHLIN AFB, TX, 78843-5101
Description
COMBINED SYNOPSIS/SOLICITATION NOTICE This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. Solicitation number FA309926Q0022 is issued as a request for quotation (RFQ). This acquisition is set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. This is a 100% Small Business Set-Aside. The associated North American Industry Classification System (NAICS) code is 236220 (Commercial and Institutional Building) with a corresponding small business size standard of $45.0 Million. REQUIREMENT DESCRIPTION The 47th Contracting Squadron at Laughlin Air Force Base, Texas, intends to award a Firm-Fixed-Price (FFP) contract. The Contractor shall provide all labor equipment and materials to renovate Silver Wings, B308. Work includes a total refresh of equipment and options for upgrading the area with additional seating (window counter, patio), paint, flooring, window tinting and shades. The wall that divides the service area and kitchen will be moved forward to create a small hallway, allowing for more room in the kitchen and prep area. Seating will also be moved onto the patio area outside to increase seating capacity. SITE VISIT AND BASE ACCESS Laughlin AFB is a controlled-access installation. All site visit attendees must be U.S. citizens and be able to obtain a base pass for entry. To be granted access, attendees must not have any derogatory information that would prevent access to a Federal installation. The Government will not sponsor any individual unable to meet these standard access requirements. A pre-award site visit will be conducted on Friday, August 28, 2026, at 10:00 a.m. Central Daylight Time (CDT). Attendees who require sponsorship for Installation Access must submit their names to the Contracting Officer and Contract Specialist no later than Thursday, August 27, 2026, 4:00 p.m. Central Daylight Time (CDT). Upon receipt of names and attendees, details will be provided regarding the meeting location and instructions for access. See Schedule for further instructions. Due to timeline constraints, this notice is made to accomodate the short-notice site visit opportunity. Please continue to monitor this posting for the official schedule of Solicitation Terms and Conditions will follow shortly.
Documents 13
- Solicitation - FA309926Q0022.pdf793 KB
- 1. MXDP 23-5000 SOW.pdf169 KB
- 2. TX20260186 – Building - 02 January 2026.pdf30 KB
- A. Building 308 Floor Plan.pdf66 KB
- B. Division 01 Specification Guidelines.pdf266 KB
- C. Laughlin AFB Installation Facilities Standards.pdf82.1 MB
- D. Environmental Quality Specifications.pdf5.0 MB
- E. Building 308 Existing Site Photographs.pdf4.3 MB
- F. Conceptual Design Layout.pdf303 KB
- G. FFE List.pdf86 KB
- H. Schedule of Submittals.xlsx32 KB
- I. Progress Schedule and Progress Report.xlsx119 KB
- J. 47 CES As-Built Deliverable Requirements.pdf241 KB
Files download directly from SAM.gov.