Skip to main content
Pragmonica
Combined Synopsis/SolicitationTotal Small Business Set-AsideActive2 days

NextGEN Infrastructure Upgrades

Original title: DG01--NextGEN Infrastructure Upgrades

VETERANS AFFAIRS, DEPARTMENT OF › VETERANS AFFAIRS, DEPARTMENT OF › 241-NETWORK CONTRACT OFFICE 01 (36C241)

At a glance

The Department of Veterans Affairs seeks a small business contractor for NextGEN infrastructure upgrades at the West Haven, CT campus. This Total Small Business Set-Aside covers work described in attached access point diagrams, with no additional drawings or site visits provided. Quotes are due by September 3, 2026 at 9:00 PM UTC.

AI-generated summary — verify details in the original notice below and on SAM.gov.

Key details

Notice ID
73c56a35589b49fb98c2dea31348b0d6
Solicitation #
36C24126Q0644
Posted
Response deadline
Archive date
Oct 3, 2026
NAICS
238210 — Electrical Contractors And Other Wiring Installation Contractors
PSC
DG01 — It And Telecom - Network Support Services (Labor)
Set-aside
Total Small Business Set-Aside
Place of performance
Department of Veterans Affairs VA West Haven 950 Campbell Ave, West Haven, CT, 06516, USA
Contracting office
TOGUS, ME, 04330

Description

NextGEN Infrastructure Upgrades - RFIs .Does attendance at the 21 August site visit condition eligibility to quote by the 28 August 2026, 5:00 PM Eastern closing date? No, attendance is not mandatory. If attendance is required, would the Government consider either a second walkthrough before the closing date, or an escorted walkthrough for a single authorized subcontractor representative at a time convenient to Engineering? Attendance was not mandatory, additionally another site visit will not be granted. Is there any information identifying the approximate conduit routes and run lengths, telecommunications-room locations, access-point locations, ceiling or mounting heights, and site-access conditions? We reviewed the solicitation attachments and located the West Haven campus map and the general VA telecommunications infrastructure standard; however, we did not find project-specific drawings or photographs of the work areas. All APs Diagram attached. No additional drawings will be provided.

Documents 11

Files download directly from SAM.gov.