Skip to main content
Pragmonica
Combined Synopsis/SolicitationTotal Small Business Set-AsideActive13 days

NFSR 24 Road Reconditioning, Aggregate Surfacing, and Stabilization

Original title: NFSR 24 Stabilization and Preservation

AGRICULTURE, DEPARTMENT OF › FOREST SERVICE › USDA-FS, CSA SOUTHWEST 7

At a glance

The USDA Forest Service seeks a small business to recondition, surface, and stabilize approximately 13 miles of National Forest System Road 24 on the Apache-Sitgreaves National Forests in Springerville, Arizona. Work includes reestablishing the road template and applying a lignosulfonate/magnesium chloride dust palliative blend. Quotes are due September 14, 2026, at 1:00 PM Central Daylight Time.

AI-generated summary — verify details in the original notice below and on SAM.gov.

Key details

Notice ID
74c8fbe5134a4f13b31af411c1955bfa
Solicitation #
127EAX26Q0081
Posted
Response deadline
Archive date
Sep 29, 2026
NAICS
237310 — Highway, Street, And Bridge Construction
PSC
Z2LB — Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways
Set-aside
Total Small Business Set-Aside
Place of performance
Springerville, AZ, 85938, USA
Contracting office
Albuquerque, NM, 871023498

Description

Amentment 0001 - 1. Update the site visit date, RFI due date and Quote due date as listed below. Organized Site Visit: An organized site visit will be held on August 24th, 2026 at 10:00am Local time. From Eager, travel west from the intersection of Central Ave and Main St on AZ-Hwy 260 for approximately 3.1 miles. Turn left (south) onto AZ-Hwy 261 and continue for approximately 17.9 miles. At the intersection with AZ-Hwy 273 turn left (south) onto AZ-Hwy 273 and continue for approximately 2.5 miles. AZ-Hwy 273 turns to NFSR 249 (Three Forks Road). Continue on NFSR 249 for approximately 0.7 miles. Turn right (south-west) onto NFSR 249E and continue for approximately 0.7 miles to the intersection with NFSR 24. This project begins here and proceeds approximately 13 miles south till the NFSR 24 intersection with NFSR 26. Requests For Information (RFI’s): Questions shall be submitted via email to troy.mccullough@usda.gov and are due no later than September 3rd, 2026, at 1:00 PM Central Daylight Time. This will ensure enough time to respond before the solicitation period ends. Please include the solicitation name and number as the subject line of the email. Proposal Due Date: All proposals shall be emailed to the Contract Specialist at troy.mccullough@usda.gov no later than September 14th, 2026, 1:00 PM Central Daylight Time. The USDA Forest Service, Apache—Sitgreaves National Forests, Springerville, Arizona, has a requirement for NFSR 24 Road Reconditioning, Aggregate Surfacing, and Road Stabilization on the Alpine Ranger District, Apache County, Arizona. Work is outlined in FP-24 Section 312 Dust Palliative and includes reestablishing the road template on NFSR 24, and stabilizing road surface aggregate with 80/20 Lignosulphonate/Mag Chloride Blend product. Placement will take place on NFSR 24 from intersection with the NFSR249E to the intersection of road with NFSR 26 (MP 13). Key dates: Site Visit: August 24th at 10:00 AM Local Time RFI's Due: September 3rd at 1:00 PM Central Daylight Time Quotes Due: September 14th at 1:00 PM Central Daylight Time

Documents 10

Files download directly from SAM.gov.