Skip to main content
Pragmonica
Combined Synopsis/SolicitationTotal Small Business Set-AsideClosedDeadline passed

A newer notice for solicitation 12639526Q0184 was posted on Aug 27, 2026. Renovate Building 6403 Containment Lab, Edinburg, TX

Renovate Building 6403 Containment Lab (Arthropod Quarantine Facility) - Edinburg, TX

Original title: Renovate Building 6403 Containment Lab

AGRICULTURE, DEPARTMENT OF › ANIMAL AND PLANT HEALTH INSPECTION SERVICE › MRPBS MINNEAPOLIS MN

At a glance

USDA APHIS seeks a small business to renovate the Arthropod Quarantine Facility at Building 6403 in Edinburg, TX, upgrading mechanical, electrical, and plumbing systems and refreshing interior finishes. The work is set aside for small businesses. Responses are due by August 31, 2026.

AI-generated summary — verify details in the original notice below and on SAM.gov.

Key details

Notice ID
4eed46627a624351a07e8d967b28d546
Solicitation #
12639526Q0184
Posted
Response deadline
Archive date
Sep 15, 2026
NAICS
236220 — Commercial And Institutional Building Construction
PSC
Y1JZ — Construction Of Miscellaneous Buildings
Set-aside
Total Small Business Set-Aside
Place of performance
Edinburg, TX, 78541, USA
Contracting office
MINNEAPOLIS, MN, 55401

Description

The Science and Technology Mission Lab’s Arthropod Quarantine (AQ) Facility is a high security containment facility intended to support biological control programs, new insect strain developments, and invasive species testing. The facility consists of an AQ office, receiving lab, identification lab, three other laboratories, three main hallways, twelve walk-in environmental growth chambers (EGCs), two EGC walkways, a headhouse/potting area adjacent to five separately controlled greenhouses, extended greenhouse foyer, a pot and clothing washing area, storage area, lunchroom, emergency exit room, secured-access exterior autoclave room, interior autoclave room, separate male & female dressing rooms with showers, bathrooms, ante-room, sign-in room, and foyer. The facility needs major renovation. The project will upgrade mechanical, electrical, and plumbing systems and refresh interior finishes. Site visit attendance sheet is posted below. RFIs and Responses, and amendment 1 with its attachments are posted below. More RFIs and responses posted below. Amendment 2 and its atttachments are posted below, along with an updated RFI log. An asbestos survey is being conducted and results will be posted next week. Amendment 3 is posted below.

Documents 18

Files download directly from SAM.gov.