Skip to main content
Pragmonica
Combined Synopsis/SolicitationTotal Small Business Set-AsideActive15 days

Renovate Secure Facility B1049 - Design/Build Construction

Original title: Renovate Secure Facility B1049

DEPT OF DEFENSE › DEPT OF THE AIR FORCE › FA9401 377 MSG PK

At a glance

The Air Force seeks design/build construction services to renovate secure facility B1049 at Kirtland AFB, NM, including a new 25x25 ft enclosed storage space with mezzanine, staircase, four opaque skylights, and utility modifications. This total small business set-aside requires proposals by September 16, 2026; a voluntary site visit is scheduled for August 28, 2026.

AI-generated summary — verify details in the original notice below and on SAM.gov.

Key details

Notice ID
211d3486f77642dbaa24e7cf43852b06
Solicitation #
FA9401-26-R-0024
Posted
Response deadline
Archive date
Oct 1, 2026
NAICS
236220 — Commercial And Institutional Building Construction
PSC
Z2AA — Repair Or Alteration Of Office Buildings
Set-aside
Total Small Business Set-Aside
Place of performance
Kirtland AFB, NM, 87117, USA
Contracting office
KIRTLAND AFB, NM, 87117-0001

Description

UPDATES: Amendment 001: The clause '52.211-12, Liquidated Damages-Construction" has been added to the attached solicitation document titled "Solicitation - FA940126R0024_31 Aug 2026". 14 August 2025: Answers to all questions received thus far have been posted in the attachments section. Additional questions may be submitted until before 02 September 2026 at 4:00 MST. --------------------------------------------- IMPORTANT DATES SITE VISIT: A site visit for interested contractors is scheduled for Friday, 28 August 2026 at 0930 MST. All parties will meet at Truman Gate Visitor Center to be sponsored onto base no later than 9:00 AM (MST). Attendance at the site visit will be limited to no more than two (2) representatives per company. Please allow extra time to obtain your pass. Attending the site visit is not required in order to be considered for award, but is highly encouraged so as to understand the site layout well. QUESTIONS: Please submit any questions regarding this opportunity at any time before 02 September 2026 at 4:00 MST. Questions may be answered as received, but will all be addressed no later than 04 September 2026 at COB. IMPORTANT: see page 23 of the solicitation document for full information on the site visit and all instructions for submission of offers. --------------------------------------------- REQUIRED TEXT This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. Solicitation number FA9401-26-R-0024 is issued as a request for proposal (RFP) for design/build construction services in order to renovate building B1049. This acquisition is set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. Please refer to the attached solicitation document for detailed information on: 1. Line items, quanitities and units of measure. 2. Dates and places of delivery and acceptance and F.O.B.point. 3. A list of contract provisions and clauses that apply to the solicitation. 4. The date, time, and place for receipt of offer and point of contact. --------------------------------------------- PROJECT DESCRIPTION/SUMMARY FROM THE SOW The customer mentioned has a requirement for the renovation of secure facility B1049. The primary objective of this project is to construct a newly enclosed storage space 25 feet x 25 feet, featuring a mezzanine above. Prior to the start, contractor shall remove existing Space Saver storage system in its entirety. Access to the Mezzanine will be provided by a metal staircase. The lower storage is designated for miscellaneous equipment storage, while the mezzanine will accommodate small to medium electronic devices. Additionally, four (4) opaque skylights will be installed. Modify and relocate utilities as necessary. The contractor shall encompass, without limitation, the following responsibilities: performing field verifications; supplying all necessary labor, tools, equipment, permits, and licenses; and executing the project construction in full compliance with the specifications detailed in the project's SOW. (End of description)

Documents 9

Files download directly from SAM.gov.