Combined Synopsis/SolicitationTotal Small Business Set-AsideActive13 days
Selkirk to Surf Road Maintenance and Recreation Improvements
Original title: Selkirk to Surf Road Maintenance
AGRICULTURE, DEPARTMENT OF › FOREST SERVICE › USDA-FS, CSA INTERMOUNTAIN 8
At a glance
The Forest Service seeks a small business to perform road maintenance and improve trails, bridges, campgrounds, and scenic viewpoints along the North Cascades Recreation Scenic Corridor in Okanogan County, WA. This Total Small Business Set-Aside (NAICS 237310) requires proposals by September 14, 2026, at 1:00 PM Pacific Time.
AI-generated summary — verify details in the original notice below and on SAM.gov.
Key details
- 604e7e726d6944b29ffe5eec047330af
- 1240LT26Q0115
- Sep 29, 2026
- 237310 — Highway, Street, And Bridge Construction
- Z2LB — Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways
- Total Small Business Set-Aside
- Wenatchee, WA, 98801, USA
- Ogden, UT, 844012310
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 1240LT26Q0115 is issued as a Request for Quotation (RFQ) for Selkirks to Surf project area; with the overall intention to make improvements to trails, bridges, campgrounds, and scenic viewpoints across the North Cascades Recreation Scenic Corridor. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237310 The small business size standard is $45M This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. The project is located within the Methow Valley Ranger District of the Okanogan-Wenatchee National Forest, Okanogan County, Washington. To access the project from Winthrop, WA head west on SR-20 for 13.2 miles, then turn right onto Lost River Road towards Mazama, WA. In 1500 ft, at the stop sign and junction with Goat Creek Road, stay left (northwest) on Lost River Road and proceed 6.8 miles to Beginning of Project (BOP) at MP 0.00 of FSR 5400 Harts Pass Road. BOP of FSR 5400600 Slate Peak Road is at end termini of FSR 5400. Questions shall be submitted via email to christopher.malley@usda.gov and are due no later than September 7, 2026, at 1:00 PM Pacific Time. All proposals shall be emailed to the Contract Specialist christopher.malley@usda.gov and pps.proposals@usda.gov no later than September 14, 2026, 1:00 PM Pacific Time.
Documents 9
- Attachment 3 - Plans.pdf24.6 MB
- Attachment 8 - Wage Determination.pdf22.5 MB
- Attachment 4 - FSSS - Specifications.pdf674 KB
- 1240LT26Q0115 - Selkirk to Surf Road Maintenance.pdf772 KB
- Attachment 5 - Fire Clauses.pdf179 KB
- Attachment 7 - Fire Plan.pdf97 KB
- Attachment 6 - Camping Permit.pdf95 KB
- Attachment 2 - Statement of Work.docx20 KB
- Attachment 1 - Schedule of Items.xlsx13 KB
Files download directly from SAM.gov.