A newer notice for solicitation FA813726R0048 was posted on Aug 19, 2026. Tinker AFB MAC BOA WWYK250131: Replace Ridge Cap on Hangar Roof, Building 824
Tinker AFB MAC BOA WWYK250131: Replace Ridge Cap on Hangar Roof, Building 824
Original title: TINKER AFB MAC BOA WWYK250131 Replace Ridge Cap on Hangar Roof, B824
DEPT OF DEFENSE › DEPT OF THE AIR FORCE › FA8137 AFSC PZIOC
At a glance
The Air Force seeks a small business Multiple Award Construction (MAC) Basic Ordering Agreement (BOA) holder to replace the ridge cap on the Hangar Roof at Building 824, Tinker AFB, Oklahoma. Competition is restricted to current Tinker AFB MAC BOA prime contractors. Proposals are due by September 10, 2026, and a mandatory site visit is scheduled for August 6, 2026.
AI-generated summary — verify details in the original notice below and on SAM.gov.
Key details
- 1ef297276f774e4ea623994d7905faee
- FA813726R0048
- Dec 31, 2026
- 236220 — Commercial And Institutional Building Construction
- Z1BZ
- Total Small Business Set-Aside
- Tinker AFB, OK, 73145, USA
- TINKER AFB, OK, 73145-9125
Description
Documents 5
- ATT10_250131_Drawings.pdf11.4 MB
- ATT08_250131_MACB_SOW.pdf265 KB
- Solicitation - FA813726R0048.pdf576 KB
- EAL List - 250131.xlsx62 KB
- 250131_Specs.zip162.8 MB
Files download directly from SAM.gov.