SolicitationService-Disabled Veteran-Owned SB Set-AsideActive14 days
Upgrade Chiller Plant Construction at Northport VA Medical Center (Project 632-25-101)
Original title: Z1DA--Upgrade Chiller Plant Construction Northport - Project 632-25-101
VETERANS AFFAIRS, DEPARTMENT OF › VETERANS AFFAIRS, DEPARTMENT OF › PCAC (36C776)
At a glance
The Department of Veterans Affairs seeks a Service-Disabled Veteran-Owned Small Business for phased construction to upgrade the chiller plant at the Northport, NY medical center. Work includes demolition, installation of a temporary chiller plant to maintain facility operations, and permanent plant construction in two sequential phases. Proposals are due by September 15, 2026.
AI-generated summary — verify details in the original notice below and on SAM.gov.
Key details
- 64dd80bbec7d4dc9bc1dafd7469728ec
- 36C77626B0024
- Dec 31, 2026
- 236220 — Commercial And Institutional Building Construction
- Z1DA — Maintenance Of Hospitals And Infirmaries
- Service-Disabled Veteran-Owned SB Set-Aside
- Northport, NY, 11768, USA
- INDEPENDENCE, OH, 44131
Description
Work includes general construction and alterations, of the existing chiller plant and includes the necessary removal of existing building components, systems, construction and installation of certain other items. The project will be constructed in two phases. Phase 1 work shall be completed and fully operational, supporting the medical facility, before a notice to proceed with phase 2 work will be issued. The project includes the installation and maintenance of a temporary chiller plant to support the Medical Facility during construction. All temporary installations shall remain in service until the end of the project’s startup of the new chiller plant and final acceptance.
Documents 16
- 36C77626B0024 0003.pdf127 KB
- 36C77626B0024 0002.pdf133 KB
- Technical Questions Responses - Northport Chiller - 8-5-26.pdf223 KB
- 36C77626B0024 0001.pdf128 KB
- Site Visit Sign-in Sheet - Northport Chiller 7-16-26.pdf271 KB
- 36C77626B0024 - 7-7-26.pdf885 KB
- ATTACHMENT 1 - SOW - Upgrade Chiller Plant.pdf203 KB
- ATTACHMENT 2 - Specifications.pdf7.8 MB
- ATTACHMENT 3 - Drawings.pdf67.8 MB
- ATTACHMENT 4 - Existing Facility Drawings.pdf3.4 MB
- ATTACHMENT 5 - Asbestos Report.pdf6.3 MB
- ATTACHMENT 6 - Pre-Construction Risk Assessment.pdf2.0 MB
- ATTACHMENT 7 - Infection Control Risk Assessment.pdf3.3 MB
- ATTACHMENT 8 - Limitations on Subcontracting - Construction.docx18 KB
- ATTACHMENT 9 - Construction Wage Rates - Suffolk 5-18-26.pdf83 KB
- ATTACHMENT 10 - Site Visit Instructions.pdf3.8 MB
Files download directly from SAM.gov.