PresolicitationTotal Small Business Set-AsideActive
Vertical Construction Multiple Award Contract (MAC) - Malmstrom AFB
Original title: Vertical Construction Multiple Award Contract (MAC)
DEPT OF DEFENSE › DEPT OF THE AIR FORCE › FA4626 341 CONS LGC
At a glance
The Air Force plans a small business set-aside Multiple Award Contract for design-bid-build and design-build vertical construction at Malmstrom AFB, MT, including launch and missile alert facilities. The MAC has a five-year base with a two-year option and a $100M ceiling; the first task order covers HVAC repairs for Building 1082.
AI-generated summary — verify details in the original notice below and on SAM.gov.
Key details
- 30410a5355d243899c07074f04277831
- FA4626-26-R-0007
- Sep 15, 2026
- 236220 — Commercial And Institutional Building Construction
- Z2JZ — Repair Or Alteration Of Miscellaneous Buildings
- Total Small Business Set-Aside
- Malmstrom AFB, MT, 59402, USA
- MALMSTROM AFB, MT, 59402-6863
Description
PRIMARY MAC - The purpose of the Vertical Construction MAC is to provide design-bid-build and design-build construction services for a broad range of military renovation and construction projects, primarily in support of the Malmstrom AFB installation, Launch Facilities (LF), and Missile Alert Facilities (MAFs). Work performed under Vertical Construction MAC orders may include but is not limited to the repair, renovation, alteration, and/or demolition of various vertical structures, building equipment & systems (plumbing, electrical, HVAC, fire suppression, etc.), and interior/exterior finishes. The initial ordering period is projected to be five (5) years with a two (2) year option year (potential total contract length of seven (7) years) and will have an estimated overall contract ceiling of $99,999,999.99. SEED PROJECT – The proposed initial task order to be awarded under the Vertical Construction MAC is the DSN/CSN Repair Bldg. 1082 HVAC project on Malmstrom AFB, MT. This project consists of developing conceptual documents for two (2) courses of action (COAs) to provide backup cooling and humidification along with a rough order of magnitude for each COA. The COAs should include HVAC components similar to the existing system. The Government will select one (1) COA to take to the 65% design and develop into a 100% Type B design. The seed project period of performance is 242 calendar days after receipt of notice to proceed (NTP). Construction may commence after acceptance of the 65% design.
Documents 8
- Solicitation - FA462626R0007 - DRAFT.pdf1.8 MB
- 2_BW As-Builts 2009 HVAC B 1082.pdf1.7 MB
- 2_As Builts 2009 HVAC - DRAFT.pdf9.2 MB
- 4_Bldg. 1082 Asb Pb Survey Results_2009 - DRAFT.pdf3.8 MB
- 4_ACM Report_2015 - DRAFT.pdf1.4 MB
- 1_Design Build SOW - DRAFT.pdf715 KB
- 3_Bldg. 1082 HVAC Submittal Schedule - DRAFT.pdf572 KB
- Vertical MAC Pre-Sol Notice.pdf121 KB
Files download directly from SAM.gov.