PresolicitationActive
Webbers Falls Excitation System Replacement – Design-Build
Original title: Webbers Falls Excitation System
DEPT OF DEFENSE › DEPT OF THE ARMY › W076 ENDIST TULSA
At a glance
The U.S. Army Corps of Engineers, Tulsa District, plans to issue an unrestricted, firm-fixed-price design-build solicitation to replace excitation systems and potential transformers for all units at Webbers Falls Powerhouse in Webbers Falls, Oklahoma. Estimated construction value is $1 million to $5 million with a 300-calendar-day performance period. The solicitation is expected around 31 August 2026, with proposals due approximately 1 October 2026.
AI-generated summary — verify details in the original notice below and on SAM.gov.
Key details
- 385c98be005c47aaa6977232e4490668
- W912BV26RA029
- Sep 1, 2026
- 237990 — Other Heavy And Civil Engineering Construction
- Z2KA — Repair Or Alteration Of Dams
- Webbers Falls, OK, USA
- TULSA, OK, 74137-4290
Description
Pre-solicitation Notice For Webbers Falls Excitation System Replacements at Webbers Falls, OK This is a PRE-SOLICITATION NOTICE for the Webbers Falls Excitation System Replacements in Webbers Falls, Oklahoma. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SYNOPSIS. No reimbursement will be made for any costs associated with providing information in response to this pre-solicitation notice or any follow up postings. The U.S. Army Corps of Engineers – Tulsa has been tasked to solicit for and award a contract for the Webbers Falls Excitation System Replacements, at Webbers Falls, Oklahoma. The proposed design-build project will be procured as an Unrestricted, firm-fixed price contract in accordance with Revolutionary FAR Overhaul (RFO) Part 15, Negotiated Procurement, using the Lowest Price Technically Acceptable approach. Tradeoffs will not be permitted. Project Description: This project includes the replacement of the excitation systems (including the Potential Transformers) for all units at Webbers Falls Powerhouse. The installation and commissioning of Unit 1 will be dependent on the availability of the unit, which is currently out of service due to issues with the speed gear. The Contractor will be responsible for designing and manufacturing the new excitation system equipment, delivering to the site, removing the existing equipment, installing the new equipment, and commissioning the new system. They will also perform model validation testing and reporting as listed above. The Hydroelectric Design Center (HDC) will provide submittal reviews, factory visit(s) to witness factory testing, and commissioning support to include determining draft settings for the excitation systems. The government will be responsible for landing all new cable (except for the AC cables from the bus tap to the Potential Transformers and the DC cables from the exciter to the brush rigging) to all external locations within the powerhouse, external to the new exciter and Potential Transformer cubicles. The estimated magnitude of construction for this project is between $1,000,000 and $5,000,000. The North American Industry Classification System code for this procurement 237990 ( Other Heavy and Civil Engineering Construction) which has a small business size standard of $45M. The Product Service Code is: Z2KA (Repair or Alteration of Dams) Estimated duration of construction of this project is 300 calendar days. Anticipated solicitation issuance date is on or about 31 August 2026, and the estimated proposal due date will be on or about 01 October 2026.
Documents
No public attachments listed — view documents on SAM.gov ↗