A newer notice for solicitation 69056726R000015 was posted on Jul 28, 2026. Wyoming NP YELL 15(2) Madison River Bridge Replacement Yellowstone National Park
WY NP YELL 15(2) Madison River Bridge Replacement and Road Reconstruction
Original title: WY NP YELL 15(2), Madison River Bridge
TRANSPORTATION, DEPARTMENT OF › FEDERAL HIGHWAY ADMINISTRATION › 690567 WESTERN FEDERAL LANDS DIV
At a glance
The Federal Highway Administration plans to solicit proposals for constructing a temporary two-lane traffic bridge and detour, removing the existing bridge, installing riprap scour protection, building a new bridge, performing stone masonry and geotechnical ground improvements, and reconstructing approach roads and parking areas in Yellowstone National Park, Wyoming. The estimated contract value is $20–$30 million with a tentative solicitation in Fall/Winter 2027/2028 and fixed completion by Fall 2030. Interested vendors must be registered in SAM.gov to access the interested vendors list and follow the opportunity for notification.
AI-generated summary — verify details in the original notice below and on SAM.gov.
Key details
- 6bf9d6471e35494989b20bbaa93f8387
- 69056726R000015
- Jul 1, 2028
- 237310 — Highway, Street, And Bridge Construction
- Y1LB — Construction Of Highways, Roads, Streets, Bridges, And Railways
- Yellowstone National Park, WY, USA
- VANCOUVER, WA, 98661
Description
Documents 3
- QandA_07-06-2026.pdf173 KB
- Prelim Letter_WY NP YELL 15(2) Madison River Bridge.pdf188 KB
- Prelim Plans_yell01502.pdf48.9 MB
Files download directly from SAM.gov.