A newer notice for solicitation 69056726R000015 was posted on Jul 28, 2026. Wyoming NP YELL 15(2) Madison River Bridge Replacement Yellowstone National Park
WY NP YELL 15(2): Madison River Bridge Replacement — Two-Lane Temporary Bridge, Detour, Riprap Scour Protection, Stone Masonry, Ground Improvements, Parking & A
Original title: WY NP YELL 15(2), Madison River Bridge
TRANSPORTATION, DEPARTMENT OF › FEDERAL HIGHWAY ADMINISTRATION › 690567 WESTERN FEDERAL LANDS DIV
At a glance
The Federal Highway Administration plans to solicit a contract for constructing a two-lane temporary traffic bridge and detour, removing the existing bridge, installing riprap scour protection, building a new bridge, performing stone masonry and geotechnical ground improvements, and upgrading parking and approach roads near West Yellowstone, Montana, in Yellowstone National Park, Wyoming. The estimated price exceeds $20 million. A tentative solicitation is expected in fall/winter 2027/2028 with a fixed completion date of fall 2030; no set-aside is indicated.
AI-generated summary — verify details in the original notice below and on SAM.gov.
Key details
- 3dfec88ea58a4f08b5fe8333f67acab3
- 69056726R000015
- Jul 1, 2028
- 237310 — Highway, Street, And Bridge Construction
- Y1LB — Construction Of Highways, Roads, Streets, Bridges, And Railways
- Yellowstone National Park, WY, USA
- VANCOUVER, WA, 98661
Description
Documents 3
- QandA_07-06-2026.pdf173 KB
- Prelim Letter_WY NP YELL 15(2) Madison River Bridge.pdf188 KB
- Prelim Plans_yell01502.pdf48.9 MB
Files download directly from SAM.gov.