Skip to main content
Pragmonica
SolicitationTotal Small Business Set-AsideActive13 days

Big Piney Ranger Station Interior Sewer Line Replacement

Original title: Big Piney Office Interior Sewer Line Replacement

AGRICULTURE, DEPARTMENT OF › FOREST SERVICE › BRIDGER-TETON NATIONAL FOREST

At a glance

The Forest Service seeks a small business to replace the interior sewer line at the Big Piney Ranger Station in Big Piney, Wyoming. Work includes demolishing flooring and concrete slab, disconnecting and reconnecting 17 plumbing fixtures, and replacing 81 feet of sewer line with slab and floor restoration. Quotes are due by September 14, 2026, at 11:00 AM UTC.

AI-generated summary — verify details in the original notice below and on SAM.gov.

Key details

Notice ID
06461d780fa54ffe92bc48e578f44314
Solicitation #
1240LT26Q0154
Posted
Response deadline
Archive date
Sep 29, 2026
NAICS
237110 — Water And Sewer Line And Related Structures Construction
PSC
Y1ND — Construction Of Sewage And Waste Facilities
Set-aside
Total Small Business Set-Aside
Place of performance
Big Piney, WY, 83113, USA
Contracting office
JACKSON, WY, 83001

Description

This project consists of replacement of the sewer line and related repair work on the Big 1.2 Piney Ranger Station on the Bridger-Teton National Forest (NF). The facility is operated by the Bridger-Teton NF on the Big Piney Ranger District in Big Piney, Wyoming. Work will include demolition of finished flooring as needed, demolition of concrete slab along 81’ of sewer line, disconnection of 17 plumbing fixtures, replacement of sewer line, patching of concrete slab and replacement of aggregate, reconnection of 17 plumbing fixtures, and replacement of finished flooring. Work includes the removal and proper disposal of all demolished materials. The contractor shall provide all required materials. Quotes should describe the method that will be used to replace the sewer line, and what areas will be effected by related demolition work.

Documents 7

Files download directly from SAM.gov.