Solicitation8(a) Set-AsideClosedDeadline passed
A newer notice for solicitation W9123626BA006 was posted on Aug 25, 2026. Fort Lee Vehicle Recovery Range Construction
Fort Lee Vehicle Recovery Range Construction 8(a) Set-Aside
Original title: Fort Lee Vehicle Recovery Range
DEPT OF DEFENSE › DEPT OF THE ARMY › W2SD ENDIST NORFOLK
At a glance
The Army seeks an 8(a) certified contractor to build 24 concrete turning pads with drainage and road repairs at Fort Lee, VA, in three sequential phases. Only one phase is accessible at a time, and later phases depend on option exercises while training continues elsewhere. Proposals are due by September 1, 2026.
AI-generated summary — verify details in the original notice below and on SAM.gov.
Key details
- 078e7981e3104731bc0f4dc2446d7953
- W9123626BA006
- Aug 4, 2027
- 236220 — Commercial And Institutional Building Construction
- Y1PZ — Construction Of Other Non-Building Facilities
- 8(a) Set-Aside
- Fort Lee, VA, USA
- NORFOLK, VA, 23510-1096
Description
Amendment 0004: An amendment has been made to Solicitation W9123626BA0006. Please see attachment SF30, Solicitation Amendment W9123626BA006_0004, extending the bid due date and bid opening date. The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.
Documents 1
Files download directly from SAM.gov.