Combined Synopsis/SolicitationTotal Small Business Set-AsideClosedDeadline passed
A newer notice for solicitation 12445226Q0033 was posted on Aug 14, 2026. Multiple Trail Bridges Replacement Project Phase 2
Multiple Trail Bridges Replacement Project Phase 2
AGRICULTURE, DEPARTMENT OF › FOREST SERVICE › USDA-FS, CSA EAST 12
At a glance
The U.S. Forest Service seeks a small business to construct seven new trail bridges, repair one trail embankment fill slope failure, and build one boardwalk platform with ramp in the Chattooga River Ranger District of the Chattahoochee-Oconee National Forest near Lakemont, Georgia. This total small business set-aside (NAICS 237310, $45M size standard) requires quotations by September 1, 2026, at 4:00 PM UTC.
AI-generated summary — verify details in the original notice below and on SAM.gov.
Key details
- 30bb659acf9941f392888a01b2ca0b98
- 12445226Q0033
- Oct 1, 2026
- 237310 — Highway, Street, And Bridge Construction
- Z1LB — Maintenance Of Highways/Roads/Streets/Bridges/Railways
- Total Small Business Set-Aside
- Lakemont, GA, USA
- Atlanta, GA, 303092449
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 12445226Q0033 is issued as a Request for Quotation (RFQ) for constructing (7)- new trail bridges, reconstruction of (1)- trail embankment fill slope failure repair, and new construction of (1) - Boardwalk platform with ramp that shall tie into the new Lake Russell M.P. 2.18 trail bridge in the Chattooga River Ranger District of the Chattahoochee-Oconee National Forest. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237310 – Highway, Street, and Bridge Construction The small business size standard is $45,000,000.00. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. Disclosure of Magnitude of Construction Projects: ? Less than $25,000. ? Between $25,000 and $100,000. ? Between $100,000 and $250,000. ? Between $250,000 and $500,000. ? Between $500,000 and $1,000,000. ? Between $1,000,000 and $5,000,000. ? Between $5,000,000 and $10,000,000. ? More than $10,000,000.
Documents 10
- C04_Solicitation 12445226Q0033 Multiple Trail Bridges Replacement Project Phase 2.pdf333 KB
- C04_Attachment 1- Schedule of Items_Phase 2.xlsx24 KB
- C04_Attachment 2- Statement of Work - CRRD Trail Bridges Phase 2.pdf309 KB
- C04_Attachment 3- Lake Russell M.P. 2.18 Stakeout Cooridnates_ 12-01-25.xlsx12 KB
- C04_Attachment 4- Drawings_TS Zeta Multiple Trail Bridges Project.pdf16.5 MB
- C04_Attachment 5- Lake Russell M.P. 2.18 Trail Bridge_100% Drawings.pdf6.3 MB
- C04_Attachment 6- Davis Bacon Wage Determination- Madison County.pdf60 KB
- C04 Attachment 7- Site Visit Information- Trail Bridges Project.pdf192 KB
- C04_Attachment 8- Past Performance Questionnaire.pdf165 KB
- C04_ Attachment 9- FSSS Specifications-Multiple Trail Bridges.pdf423 KB
Files download directly from SAM.gov.