Skip to main content
Pragmonica
SolicitationTotal Small Business Set-AsideActive16 days

SOR Waterline Repair

DEPT OF DEFENSE › DEPT OF THE AIR FORCE › FA9401 377 MSG PK

Key details

Notice ID
17890c81ac0d479cbf60beb62be2b7f5
Solicitation #
FA940126R0023
Posted
Response deadline
Archive date
Oct 2, 2026
NAICS
237110 — Water And Sewer Line And Related Structures Construction
PSC
C1NE — Architect And Engineering- Construction: Water Supply Facilities
Set-aside
Total Small Business Set-Aside
Place of performance
Kirtland AFB, NM, 87117, USA
Contracting office
KIRTLAND AFB, NM, 87117-0001

Description

The primary purpose and objective of this project is to outline the scope for the design and construction of a new 7,900 feet high-pressure waterline, appurtenant systems, and associated control systems on the southeast side of KAFB. This project shall provide a robust and reliable water supply from Pump Station 2 (PS2) to the SOR and HERTF reservoirs, replacing and upgrading existing infrastructure. This includes an 8-inch, Class 350 Ductile Iron Pipe (DIP) with cement-mortar lining and an asphaltic seal coat and all associated valves and fittings, upgrade the existing control system to add SCADA to the newly installed system, Portable Hoist for Pump and Motor Maintenance, a new 15,000-gallon tank to include a booster pumps to be installed prior to the PS2, and a new 5,000-gallon tank and pre-packaged pump station at the SOR site. A site visit will be held on 03 September 2026 at 1300 MST and all parties will meet at the Truman Gate Visitors Center to be sponsored onto base at 1200 MST. Please submit the full names, date of birth, and citzenship of your attendees NLT COB 28 August 2026 and advise if you require base passes to access Kirtland AFB to the Mrs. Abigail Crespin, abigail.crespin@us.af.mil and TSgt Hillarie Johnson, hillarie.johnson@us.af.mil. All responsible sources may submit a quotation, bid, or proposal, as appropriate, which will be considered by the agency. Equitable Adjustments will be IAW RFO 52.212-4. Contractor Access to CUI attachments: If a contractor is accessing request to a restricted, government only document, they would need to submit the DD2345 for their company as part of their request. The justification (relevant business activity) in Block 4 of the DD2345 is used to determine access to controlled information they are requesting. Typically, companies include something about bidding on contracts as part of their relevant business activity. Submit a completed copy of the DD 2345 to the JCP link.

Documents 13

Files download directly from SAM.gov.