A newer notice for solicitation W9128F26SM024 was posted on Aug 18, 2026. Sources Sought and Industry Day: Sentinel Utility Corridor at Malmstrom AFB
Sources Sought and Industry Day: Sentinel Utility Corridor at Malmstrom AFB, MT
Original title: SOURCES SOUGHT ANNOUNCEMENT / INDUSTRY DAY FOR SENTINEL UTILITY CORRIDOR AT MALMSTROM AIR FORCE BASE, MONTANA
DEPT OF DEFENSE › DEPT OF THE ARMY › W071 ENDIST OMAHA
At a glance
The U.S. Army Corps of Engineers, Omaha District, is seeking industry input and hosting a virtual Industry Day for a Progressive Design-Build project to construct the Sentinel Utility Corridor at Malmstrom Air Force Base, Montana. The estimated contract magnitude is $1.4 billion to $2.0 billion. Responses to the sources sought questionnaire are due by September 24, 2026, and the virtual Industry Day is scheduled for September 4, 2026.
AI-generated summary — verify details in the original notice below and on SAM.gov.
Key details
- 8d42f1d44b604e8b9956eb9162686c27
- W9128F26SM024
- Oct 9, 2026
- 237130 — Power And Communication Line And Related Structures Construction
- Y1BG — Construction Of Electronic And Communications Facilities
- Malmstrom AFB, MT, 59402, USA
- OMAHA, NE, 68102-4901
Description
Documents 3
- Sources Sought for Sentinel Utility Corridor at Malmstrom Air Force Base Montana 11Aug26.pdf.pdf165 KB
- PDB-OTA Process Overview Placemat.pdf332 KB
- Playbook - Executing PDB with OTA _22-JUL-2026.pdf1.3 MB
Files download directly from SAM.gov.