Special NoticeActive23 days

A newer notice for solicitation W9128F26SM024 was posted on Aug 18, 2026. Sources Sought and Industry Day: Sentinel Utility Corridor at Malmstrom AFB

Sources Sought and Industry Day: Sentinel Utility Corridor at Malmstrom AFB, Montana

Original title: SOURCES SOUGHT ANNOUNCEMENT / INDUSTRY DAY FOR SENTINEL UTILITY CORRIDOR AT MALMSTROM AIR FORCE BASE, MONTANA

DEPT OF DEFENSE › DEPT OF THE ARMY › W071 ENDIST OMAHA

At a glance

The U.S. Army Corps of Engineers Omaha District is conducting market research for a Progressive Design-Build effort to construct the Sentinel Utility Corridor at Malmstrom Air Force Base, Montana, with an estimated magnitude of $1.4 billion to $2.0 billion. Interested vendors should complete the questionnaire by September 24, 2026. An industry day registration announcement will follow.

AI-generated summary — verify details in the original notice below and on SAM.gov.

Key details

Notice ID
95e4378a0b744c3d95f0374c8ae85740
Solicitation #
W9128F26SM024
Posted
Response deadline
Archive date
Oct 9, 2026
NAICS
237130 — Power And Communication Line And Related Structures Construction
PSC
Y1BG — Construction Of Electronic And Communications Facilities
Place of performance
Malmstrom AFB, MT, 59402, USA
Contracting office
OMAHA, NE, 68102-4901

Description

11 August 2026: The attached Sources Sought estimated magnitude has been updated to between approximately $1.4B to $2.0B. Please reference the attached Sources Sought and link to the Questionnaire (also included herein): https://forms.osi.apps.mil/r/PmqwFRQpQh This notice will be updated when the Industry Day is available for registration. Additional attachments include the Progressive Design-Build (PDB) with Other Transaction Authority (OTA) Playbook and Placemat to aid in understanding the acquistion process and procedures.